Pequannock Township
Town-wide Park and Recreation Master Plan
Morris County, New Jersey
Prepared by:
Professional Planning and Engineering, a division of Pennoni Associates, Inc.
September 2007
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
i
Acknowledgements
The development of this Town-wide Park and Recreation Master Plan was a
cooperative effort between the Township administration, staff and volunteers, local
recreation groups and individuals. We thank all of the people and organizations listed
below for
their input, guidance & direction in the formulation of this master plandocument.
Joel D. Vanderhoff
Mayor
Kevin P. Boyle
Township Manager
Pequannock Township Council
Joel D. Vanderhoff, Mayor
Ed Englebart
Joseph L. Jorgensen
Nicholas Kapotes, Parks and Recreation Advisory Board Liaison
Louis A. Skvarca
Pequannock Township Parks and Recreation Department
Denise Furfaro, Director
Renee Helmer, Program Coordinator
Pequannock Township Parks and Recreation Advisory Board
Jan Vanderhoff, Chairperson
William Zickler, Vice Chairperson
Robert Jones
Maureen McMahon
Dawn Skvarca
David Swezey
Douglas Troast
Bruce Vitcavich
Past Member: Evelyn Roosma
Pequannock Township Recreation Organizations
Boys and Girls Club of Northwest New Jersey
Pequannock Lacrosse Club
Pequannock Little League
Pequannock Soccer Club
Acknowledgements
PENNONI ASSOCIATES INC.
Consulting Engineers
ii
Pequannock Township Town-wide Park and Recreation Master Plan
Executive Summary
Figure 1 ~ Pequannock Township location in Morris
County showing related open waters.
Pequannock Township’s unique location
at the confluence of three rivers and at
the base of mountains and the
Township’s history affords the
Township the opportunity to provide its
residents with a wide variety of
recreation and leisure opportunities.
Pequannock Township has 646.6 acres
of open space land utilized for park
and recreation purposes. Twenty four
acres (24-acres) of two parks,
Rockledge and Cherry Street parks,
remain undeveloped. The developed
parks provide a variety of recreational
opportunities ranging from hiking,
playgrounds, athletic fields and courts,
picnic areas, lake swimming, boating,
fishing and camping.
This Town-wide Park and Recreation Master Plan (Master Plan) evaluates the number
and quality of facilities provided to Pequannock Township residents against the
anticipated needs and provides recommendations for improvements and acquisitions to
meet the anticipated demand for recreational facilities in the Township.
V
ISION, MISSION AND GOALSThe Township’s Recreation Advisory Board and Park and Recreation Director developed
vision and mission statements and goals and objectives to set the framework for the
master plan. See Chapter 2 to review the objectives and associated statements.
Vision
To provide a well rounded recreation and leisure experiences for all members of the
community.
Mission Statement
The Township will meet the physical, mental, cultural and social needs of Pequannock
residents by providing the best possible overall park system through programs,
services, facilities and structures and by preserving and developing new and existing
lands and their improvements.
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
iii
Acknowledgements
PENNONI ASSOCIATES INC.
Consulting Engineers
iv
Goals
Goal 1: To improve the quality of life for community residents.
Goal 2: Ensure equitable access to safe and attractive parks and facilities that meet
community needs.
Goal 3: Actively pursue adequate open space for future recreation facilities.
Goal 4: To preserve and enhance the social and ecological environment for Township
residents.
Goal 5: Implement and update the Parks and Recreation Master Plan (PRMP) so it
remains a dynamic guide for the Park and Recreation Department.
Goal 6: Management of the park system to the highest standards.
D
EMOGRAPHIC ANALYSISWe must remember as we go through the planning process for the Township-wide
Recreation Master Plan that we are planning for people. Since the level and quantity
of parks and recreation services demand is directly related to the number of people
demanding the given services, changes in both the number and composition of that
local population affects local government planning. A youthful population makes
different demands on parks facilities than a much older population does, and an
increase in certain cultural groups – Hispanics, for example- can create yet another set
of demands.
Since estimates of population change are crucial to planning, budgeting and financing
park improvements, they are essential to this Master Plan.
The population has been increasing in Pequannock over the last decade and, according
to the most recent Census information, is predicted to continue to rise. The greatest
change over the last decade is found in the under 5 age group and 65 and older age
group with an increase of 21.72% and 25.38% respectively. The remaining age groups
are remaining stable or increasing slightly over the last decade at 0.52% for age 5-24,
5.08% for age 25-44 and 9.55% for age 45-64.
The largest percent of the population at 29.64%, however, is found in the 25-44 age
group. Township residents age 5-24 have been steadily decreasing over the last thirty
years and they do not dominate the Township population now as they had done
historically. Age 5-24 and age 45-64 make up a similar ratio of the population at
24.83% and 24.63% respectively. Residents 65 and older make up 14.08% of the
population and children under 5 make up 6.82% of the population.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
v
R
ECREATION STANDARDS AND NEEDS ASSESSMENTBalanced Land Use Guidelines
New Jersey’s State Comprehensive Outdoor and Recreation Plan identifies the goal for
New Jersey municipalities to provide three percent (3%) of the total developable lands
within the municipality for recreation uses. This balanced land use approach takes
into consideration the extent of wetlands and steep slopes in the municipality and
removes those lands from the total developable lands within the municipality.
According to this methodology Pequannock Township, with its 647 acres of park land,
has preserved fourteen percent (14%) of its overall lands and thirty percent (30%) of
the Township’s developable lands for recreation purposes.
This analysis is unevenly balanced, however, due to eighty-two percent (82%) of the
preserved lands suitable only for passive recreation or resource areas due to wetlands
and steep slopes on the site. So while there is a significant amount of lands preserved
for recreation purposes the Township does not have a balance between lands suitable
for active and passive recreation.
Population-based Recreation Open Space Needs Assessment
In 1995, the National Recreation and Park Association (NRPA), in collaboration with
the American Academy for Park and Recreation Administration, published “Park,
recreation, Open Space and Greenway Guidelines.” The revised guidelines
acknowledge that each community is unique, and that it is difficult to apply one set of
special standards to all communities as had been done in the past. Instead, the
guidelines reflect a more systematic planning approach that takes into account the
unique needs, desires and resources of communities as well as changing
environmental, social, economic and demographic trends.
With this framework in mind, the NRPA takes a different approach to park planning,
analyzing the types of parks and facilities required for each individual community,
along with the amount of acreage required to site those kinds of parks and facilities.
The process includes identifying the classifications of parks and the level of service for
each facility within each park classification.
Table 1 below identifies Pequannock Township’s parks by classification, the
recommended acreage per classification and the surplus or deficit per classification.
There are no recommended standards for special use parks or natural resource areas.
Review of the table shows that based upon this analysis there is a deficit of park land
in all classifications with the greatest deficit in the Sports complex classification.
Acknowledgements
Table 1 ~ Parks by classification, standards and deficiencies / surplus
Recreation Need by Park Classification
The majority of the Township parks are located in the central to southern area of the
Township. This is most likely due to the location of wetlands and floodplain
influencing the initial settlement of the Township with the first homesteads in the
north central section of town. When parks and recreation development came to the
forefront there was more opportunity to set aside lands for recreation and leisure in
the central and southern part of town. This provides an imbalance to access to the
provided parks and their recreation and leisure facilities. The residents in the
southern and south-central part of the Township have better access to facilities than
those in the north and north-central part of the Township.
When evaluating the deficit of park classifications and the typical uses within those
park classes the park classification hierarchy is taken into consideration. For example,
the facilities found in a Mini Park may also be found in all of the other park
classifications except Natural Resource Area and Greenways. This could mean that a
Neighborhood Park can supply the demand for a Mini Park depending upon the location
within the Township.
In addition, School Complexes may also partially supply the demand for certain park
classifications based upon the available facilities and availability for use. In
Pequannock, Stephen J. Grace and Hillview Elementary Schools have playgrounds.
PENNONI ASSOCIATES INC.
Consulting Engineers
vi
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
vii
They may act as Mini Parks, Neighborhood Parks or Sports Complexes during non-school
hours.
Mini Parks
Mini Parks and the typical facilities of such parks are well distributed in the southern
section of town. In addition to Lyon Park and Riverside Park, Greenview Park and
Stephen J. Grace Elementary School are in the southern section of town. These
provide the facilities that a Mini Park would and are well distributed in the southern
section of town.
Hillview Elementary School serves as a Mini Park in the center of town. There is a gap
in service for the residents to the south and west of the school.
Two sites in the northern section of the Township provide the facilities found in a Mini
park, North Boulevard School and Foothills Park. Both sites have a playground.
Access to Foothills Park, however, is by vehicle not by foot as there is no safe
pedestrian access to the park. There is a gap in service between Hillview and North
Boulevard Schools north and south and east to west in the Township.
Neighborhood Parks
The Neighborhood Parks are located at opposite ends of the Township (northwest and
southeast). Greenview Park, a Community Park, can serve the need as a Neighborhood
Park. There is a gap in service with no Neighborhood Park in the central or the
northeast section of town.
Community Park
Greenview Park is the only Community Park within the Township. This serves the
residents in the southwest corner of town with a gap in service for the remainder of
the Township.
Sports Complex
Sports Complex should be strategically located within the Township. The current
facilities are centrally located on the eastern side of town.
School Complex
The schools in Pequannock Township are located in the north-south central corridor.
They serve as Mini Parks, Neighborhood Parks, and Sports Complexes. As these lands
are not managed by Pequannock Township they were not included within the
surplus/deficit calculations but will be considered as part of the facility
recommendations.
F
ACILITY NEEDThis Master Plan evaluates the facility demand based upon previous information
discussed in this report, input from the Parks and Recreation Director, the Recreation
Acknowledgements
PENNONI ASSOCIATES INC.
Consulting Engineers
viii
Advisory Board and stakeholders. This information as well as analyzing the
geographical location of the facilities was used in developing the facility needs.
Pequannock Township provides a variety of indoor and outdoor recreation and leisure
opportunities for residents. There is a need for additional facilities to support the
demand for these programs.
The outdoor facilities provided include boating, camping, fishing, hiking and nature
trails, picnic areas, ice skating, playgrounds, swimming and athletic fields. The
Township also has a Senior Center. The Township has a need to provide 3-4 additional
soccer/lacrosse fields and one baseball field to meet the growing demand. The other
outdoor activities are adequate in number. There are opportunities to capitalize on
the undeveloped lands to augment these facilities. This, however, is not a priority.
The Township does not have any facilities to support other indoor programs such as
basketball, volleyball, jazzercise, aerobics, little crafters, hands on fun, children’s
ceramics, karate, etc. The Parks and Recreation Department relies on Board of
Education (BOE) facilities for these programs. Time and space for these programs in
BOE facilities is getting less and less over the years as the BOE before school and after
school programming is expanding. The Township needs an indoor facility to continue
to be able to provide the level of programming and services the residents are
accustomed to and the Township has the ability to provide with available facilities.
R
ECOMMENDATIONSThe following are actions to be completed based upon recommendations discussed in
Chapter 7 of this report. The tasks are listed in priority order within each task category.
Immediate Actions (within one year)
1. Complete Greenview Park parking reconfiguration improvements.
2. Develop an action plan to pursue funding sources identified in the Open Space
and Recreation Plan to fund the recommended improvements.
3. Acquire funding to implement Hillview Fields improvements.
4. Remove DPW dump yard from Washington Park and remediate to residential
standards. Conduct a pre-application meeting with the NJ DEP to discuss the
proposed improvements.
5. Complete topographic and utility mapping for Washington Park improvements.
6. Develop and implement a comprehensive maintenance operations tasks and
schedule for each facility.
7. Begin negotiations for acquisition / agreement for use of Block 902 Lot 4 as a
soccer / lacrosse field with supporting parking.
8. Continue dialogue with the Board of Education on shared use for athletic fields
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
ix
and existing field reconfiguration to expand field usage. Work with the sports
groups in town to leverage funding and manpower.
9. Further explore the programming and location for an indoor community
recreation facility.
10. Complete master plan for Pequannock Valley Park.
11. Develop a plan to coordinate all recreational opportunities and organizations
within the Township with possible shared scheduling of facilities.
12. Complete site development / park and recreation design guidelines.
13. Develop signage system and hierarchy.
14. Contact owners of farm assessed lands to encourage their participation in the
farmland preservation program.
Intermediate Actions (within three years)
1. Jointly implement Board of Education athletic field improvements with the BOE
and local recreation groups.
2. Develop a self-guided tour map along the adopted greenway identifying
cultural, social, recreational and environmental points of interest.
3. Complete wetlands mapping for Rockledge Park, Cherry Street Park, Hidden
Cove and Lyman Park.
4. Update Aquatic Park Master Plan
5. Develop “Friends of the Park” program.
6. Develop and adopt a Township Greenway Network.
7. Complete Hillview Fields Improvements.
8. Complete Washington Park improvements.
9. Complete Rockledge Park improvements
10. Implement signage improvements.
Intermediate Actions (within five years)
1. Complete soccer / lacrosse field improvements at Aquatic Park.
2. Riverside Park expansion feasibility study.
3. Complete Aquatic Park Master Plan recommendations.
4. Complete Hidden Cove improvements.
5. Complete Cherry Street Park improvements.
6. Implement Aquatic Park Master Plan.
7. Acquisition of parcels adjacent to Lyman Park (Block 4112 Lots 1&16).
8. Complete fundraising for Community Recreation Center.
Acknowledgements
PENNONI ASSOCIATES INC.
Consulting Engineers
x
Long Term Actions (within 10 years)
1. Implement Community Recreation Center.
2. Complete Woodland Lake improvements.
3. Complete remainder of Greenview Park improvements.
4. Update Park and Recreation Master Plan including the completion of a
statistically accurate user survey.
Ongoing Actions
1. Continued park maintenance.
2. Continue comprehensive maintenance operations tasks and schedule for each
facility.
3. Continued signage maintenance.
4. Continued streetscape improvements maintenance.
5. Add all new land acquisitions to the Township ROSI.
6. Actively participate in regional environmental issues (i.e. the Pia Costa Tract
wetland mitigation bank) and recreation issues (i.e. the Pequannock River
Trail).
7. Monitor land acquisition opportunities for use as recreational facilities.
8. Monitor environmental regulations and possible weakening of regulations which
would increase land acquisition for environmental preservation up in priority.
9. Work with Morris County to implement regional trails within the Township
including along the railroad right-of-way.
10. Designate a Recreation Advisory Board member as liaison to each of the
environmental, historic, open space and street tree commissions.
11. Encourage stewardship of the parks and social ties through the “Friends of the
Park” program.
12. Seek continued input from the community regarding recreation programs and
facilities.
13. Implement the fund raising action plan.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
xi
Table of Contents
ACKNOWLEDGEMENTS.........................................................................................................................I
EXECUTIVE SUMMARY........................................................................................................................III
V
ISION, MISSION AND GOALS .................................................................................................................... IIIVision ...................................................................................................................................... iii
Mission Statement ................................................................................................................... iii
Goals ......................................................................................................................................iv
D
EMOGRAPHIC ANALYSIS......................................................................................................................... IVR
ECREATION STANDARDS AND NEEDS ASSESSMENT.................................................................................. VBalanced Land Use Guidelines ................................................................................................v
Population-based Recreation Open Space Needs Assessment..............................................v
Recreation Need by Park Classification ..................................................................................vi
F
ACILITY NEED........................................................................................................................................ VIIR
ECOMMENDATIONS............................................................................................................................... VIIILIST OF ILLUSTRATIONS..................................................................................................................XIV
CHAPTER 1 - INTRODUCTION .............................................................................................................. 1
M
ASTER PLAN PROCESS ............................................................................................................................. 2CHAPTER 2 – TOWN-WIDE MASTER PLAN VISION, MISSION, GOALS AND OBJECTIVES
................. 5V
ISION STATEMENT ................................................................................................................................... 5M
ISSION STATEMENT................................................................................................................................. 5G
OALS AND OBJECTIVES: ........................................................................................................................... 5Goal 1: To improve the quality of life for community residents. .............................................. 5
Goal 2: Ensure equitable access to safe and attractive parks and facilities that meet
community needs..................................................................................................................... 6
Goal 3: Actively pursue adequate open space for future recreation facilities. ........................ 8
Goal 4: To preserve and enhance the social and ecological environment for Township
residents. ............................................................................................................................... 10
Goal 5: Implement and update the Parks and Recreation Master Plan (PRMP) so it remains
a dynamic guide for the Park and Recreation Department. .................................................. 11
Goal 6: Management of the park system to the highest standards....................................... 12
CHAPTER 3 – RELATIONSHIPS TO OTHER PLANS
................................................................................ 132003 M
ASTER PLAN REEXAMINATION REPORT ........................................................................................ 13S
TATE DEVELOPMENT AND REDEVELOPMENT PLAN ................................................................................ 16Planning Areas ...................................................................................................................... 16
S
TATEWIDE COMPREHENSIVE OUTDOOR RECREATION PLAN (2003)........................................................ 18Land Preservation.................................................................................................................. 19
Recreation ............................................................................................................................. 19
Greenways............................................................................................................................ 20
Table of Contents
PENNONI ASSOCIATES INC.
Consulting Engineers
xii
Partnerships.......................................................................................................................... 20
Stewardship ........................................................................................................................... 20
P
EQUANNOCK OPEN SPACE AND RECREATION PLAN................................................................................ 22A
QUATIC PARK MASTER PLAN................................................................................................................. 22CHAPTER 4 – RECREATION STANDARDS AND NEEDS ASSESSMENT.................................... 25
I
NTRODUCTION ........................................................................................................................................ 25B
ALANCED LAND USE GUIDELINES.......................................................................................................... 25P
OPULATION-BASED RECREATIONAL OPEN SPACE NEEDS ASSESSMENT.................................................. 26Park Classifications ............................................................................................................... 26
Recreation Need by Park Classification ................................................................................ 47
D
EMOGRAPHIC ANALYSIS........................................................................................................................ 49Population............................................................................................................................. 50
Population total
.................................................................................................................... 50Population density ................................................................................................................. 51
Housing................................................................................................................................. 51
Education.............................................................................................................................. 52
Income.................................................................................................................................. 52
F
ACILITY NEED........................................................................................................................................ 53CHAPTER 5 – INVENTORY AND ANALYSIS OF EXISTING RESOURCES ................................ 57
P
ROCESS .................................................................................................................................................. 57GIS Mapping......................................................................................................................... 57
Site Visits ............................................................................................................................... 57
P
EQUANNOCK TOWNSHIP PARK LANDS.................................................................................................... 57Aquatic Park .......................................................................................................................... 59
Cherry Street Park................................................................................................................. 59
Foothills Park ......................................................................................................................... 60
Greenview Park ..................................................................................................................... 60
Hidden Cove.......................................................................................................................... 61
Hillview Fields ........................................................................................................................ 62
Lyman Park........................................................................................................................... 62
Lyon Park.............................................................................................................................. 63
Meyers Brook......................................................................................................................... 63
Mountainside Park................................................................................................................. 64
Pequannock Valley Park ....................................................................................................... 64
Riverside Park ....................................................................................................................... 65
Rockledge Park ..................................................................................................................... 65
Town Hall Field...................................................................................................................... 66
Washington Park ................................................................................................................... 66
Woodland Lake...................................................................................................................... 67
P
EQUANNOCK TOWNSHIP BOARD OF EDUCATION LANDS......................................................................... 68O
THER RECREATION OPPORTUNITIES ....................................................................................................... 68N
ATURAL RESOURCES .............................................................................................................................. 68New Jersey Landscape Project ............................................................................................. 68
Environmental Resource Inventory ....................................................................................... 70
Vegetation and Wildlife.......................................................................................................... 74
Existing Parks Developable Lands........................................................................................ 74
A
IR QUALITY........................................................................................................................................... 75N
OISE LEVELS ......................................................................................................................................... 75C
ONTAMINATED SITES............................................................................................................................. 75Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
xiii
C
ONNECTIVITY OF OPEN SPACE SYSTEM.................................................................................................. 76CHAPTER 6 – BENCHMARK TO SIMILAR RECREATION SYSTEMS
..................................................... 103CHAPTER 7 – ACQUISITION, CAPITAL IMPROVEMENT AND MAINTENANCE RECOMMENDATIONS
................................................................................................................................................................... 105
APPENDIX A – ESTIMATES OF PROBABLE COSTS
.............................................................................. 121Table of Contents
PENNONI ASSOCIATES INC.
Consulting Engineers
xiv
LIST OF ILLUSTRATIONS
List of Figures
1. Pequannock Township location in Morris County showing related open waters............ i
2. Pequannock Township location in Morris County showing related open waters............1
3. Township Park and Board of Education facility locations.................................... 57
4. Meadow area in Aquatic Park utilized as a circular track by ATVs. ........................ 59
5. Forested area in Aquatic Park.................................................................... 59
6. Waterway in Aquatic Park. ....................................................................... 59
7. Open play area in Foothills Park. .............................................................. 60
8. Sledding at Foothills Park. ........................................................................ 60
9. Playground at Foothills Park...................................................................... 60
10. Greenview Park soccer/lacrosse field. ......................................................... 61
11. Greenview Park softball/little league field. ................................................... 61
12. Greenview Park tennis courts and attendant station......................................... 61
13. Greenview Park playground area. ............................................................... 61
14. Greenview Park restroom facility................................................................ 61
15. Hillview Field softball/little leaguer field. .................................................... 62
16. Lyman Park clearing and playground in trees.................................................. 63
17. Hampton Avenue access to Lyman Park. ....................................................... 63
18. Residential out-parcels in Lyman Park.......................................................... 63
19. Lyon Park playground equipment................................................................ 63
20. View from Mountainside Park. ................................................................... 64
21. Trail and marking at Mountainside Park. ....................................................... 64
22. Mountainside Park camp area. ................................................................... 64
23. Pequannock Valley Park swimming. ............................................................. 65
24. Members entering PV Park. ....................................................................... 65
25. PV Park picnic area with lake in the background. ............................................ 65
26. Town Hall baseball field. ......................................................................... 66
27. Town Hall basketball courts. ..................................................................... 66
28. Washington Park southern ball field. ........................................................... 66
29. Township DPW dumping area in Washington Park............................................. 67
30. Washington Park concessions building. ......................................................... 67
31. Washington Park northern ball field............................................................. 67
32. Woodland Lake boat launch and gravel parking area......................................... 67
33. Trail along a portion of Woodland Lake ........................................................ 67
34. Woodland Lake...................................................................................... 67
List of Maps
1. Context Map...........................................................................................3
2. Park and School Locations ........................................................................ 33
3. Mini Parks............................................................................................ 35
4. Neighborhood Parks ................................................................................ 37
5. School Parks ......................................................................................... 39
6. Community Parks ................................................................................... 41
7. Sports Complex ..................................................................................... 43
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
xv
8. Natural Resource Areas............................................................................ 45
9. Population Density (2000)......................................................................... 55
10. N.J. Landscape Project – Forest ................................................................. 79
11. N.J. Landscape Project – Grassland ............................................................. 81
12. N.J. Landscape Project – Emergent Wetlands ................................................. 83
13. N.J. Landscape Project – Forested Wetlands .................................................. 85
14. N.J. Landscape Project – Wood Turtle Habitat ................................................ 87
15. Geology Map......................................................................................... 89
16. Soils................................................................................................... 91
17. Hydrology ............................................................................................ 93
18. Flood Hazard Areas................................................................................. 95
19. Groundwater Recharge ............................................................................ 97
20. Aquifers Map ........................................................................................ 99
21. Land Cover (2002) .................................................................................101
22. Aquatic Park Concept Plan.......................................................................121
23. Foothills Park Concept Plan .....................................................................123
24. Rockledge Park Concept Plan ...................................................................125
25. Washington Park Concept Plan..................................................................127
List of Tables
1. Parks by classification, standards and deficiencies / surplus ................................ iv
2. Parks by classification, standards and deficits /surplus ..................................... 47
3. Pequannock Township Population Trends ...................................................... 50
4. Pequannock Township Age Cohort Trends...................................................... 50
5. Pequannock Township Age Cohort Trends as a Percent of the Total Population......... 51
6. Facility Amenities Matrix.......................................................................... 58
7. Environmental factors effecting park land development .................................... 75
8. Benchmark community’s recreation amenities...............................................103
9. Facility Strategy and Implementation Plan ...................................................119
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
Chapter 1 - Introduction
Pequannock Township is located in the northeast corner of Morris County. It is
bounded on the east by the Pompton and Ramapo Rivers. The confluence of the
Pequannock, Ramapo and Pompton Rivers is located in Aquatic Park in the northeast
corner of the Township (see Figure1 and Map 1).
The fertile valley at this confluence
drew settlers, circa 1700, who farmed
all types of vegetables, flax and raised
livestock. Many types of mills were
built for processing of the farming
products. In 1740 Pequannock
Township was formed by the General
Session of Peace. The initial
incorporation of Pequannock Township
was 74,000 acres. Succession from the
Township began in 1844. By the 1920’s
the current community of 7.04 square
miles, which consists of Pequannock
and Pompton Plains, was all that
remained as Pequannock Township
(
Pequannock Township Master Plan, p.10-12)
.Figure 2 ~ Pequannock Township location in Morris
County showing related open waters.
Pequannock Township has 646.6 acres
of open space land utilized for park
and recreation purposes (see Map 1). Twenty four acres (24-acres) of two parks,
Rockledge and Cherry Street parks, remain undeveloped. The developed parks provide
a variety of recreational opportunities ranging from hiking, playgrounds, athletic fields
and courts, picnic areas, lake swimming, boating, fishing and camping.
This Town-wide Park and Recreation Master Plan (Master Plan) evaluates the number
and quality of facilities provided to Pequannock Township residents against the
anticipated needs and provides recommendations for improvements and acquisitions to
meet the anticipated demand for recreational facilities in the Township.
A master plan is an important tool developed to manage a study area and guide its
future. A master plan takes into account not only the physical environment, but also
the economic and social aspects that have impacts on the study area’s growth and
management.
The purpose of this master plan is to provide a framework, or roadmap, for the
restoration and future improvements within South Mountain Reservation. The master
plan provides for responsible stewardship of valuable recreational, ecological, social,
and historic resources amidst a suburban environment. Goals are understood as a part
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
1
Chapter 1 - Introduction
PENNONI ASSOCIATES INC.
Consulting Engineers
2
of the process. They are tested against historic, current and anticipated conditions
and needs. From this process a series of recommendations were developed for
implementation to address the identified needs.
The Master Plan is a living document and should be continuously consulted and
updated as improvements are completed and as the residents interests change.
M
ASTER PLAN PROCESSThe Master Plan process began with the inventory and analysis of Pequannock
Township’s existing resources. This includes site visits to the existing parks to
evaluative their facilities and natural resources by sight. The recourses evaluated
included athletic fields, picnic areas, roadways, parking areas, trails, buildings,
structures, ponds/lakes and furnishings.
On-site investigations were conducted from June 2006 to November 2006 to observe
general conditions, take measurements, photographs and verify locations. Field data
was combined with information from New Jersey Department of Environmental
Protection (NJDEP), New Jersey Geologic Survey, New Jersey Department of
Transportation and the New Jersey Image Warehouse.
Projected capital improvement plans were reviewed. This included the Aquatic Park
Master Plan. There were no past capital improvement plans identified. A needs
assessment was developed speaking with stakeholders, Township staff and
administration and evaluating the number and quality of the existing facilities against
the anticipated population. The recreation and leisure facilities provided by
Pequannock Township were evaluated against similar communities in Morris County
and the neighboring municipalities.
Recommendations were developed from the synthesis and analysis of all of this
information. These include acquisition opportunities and capital improvements and
prioritization of the identified tasks. Finally a 10-year capital improvement plan was
recommended.
Pequannock Township
Recreation Master Plan
Context Map
Map 1
Information Sources:
New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Mountainside Park Aquatic Park
Greenview Park
Woodland Lake
Lyman Park
Foothills Park
Rockledge Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
MORRIS
PASSAIC
I-287
NJ 23
I-287
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
US 202
CUTLESSRD
BEAVER BROOK RD
HAUL RD
MORRIS COUNTY 660
MOUNTAIN AVE
RYERSON RD
WEST PARKWAY
MANDEVILLE AVE
PASSAIC COUNTY 6892
MORRIS COUNTY 680
RIVERDALE RD
MORRIS COUNTY 655 A
MORRIS COUNTY 651
HOPPER AVE
MORRIS COUNTY 694
ROUTE 504
ROUTE 511 ALTERNATE
ROUTE 504
US 202
CUMBERLAND
OCEAN
SUSSEX
ATLANTIC
BURLINGTON
MORRIS
SALEM
WARREN
MONMOUTH
CUMBERLAND
HUNTERDON
BERGEN
MIDDLESEX
CAPE MAY
SOMERSET
MERCER
CAMDEN
GLOUCESTER
PASSAIC
ESSEX
UNION
HUDSON
I-78
I-80
I-295
I-195
GARDEN STATE PARKWAY
I-287
I-280
NEW JERSEY TURNPIKE
I-95
I-676
NEW JERSEY TURNPIKE
I-287
I-95
3
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
5
Chapter 2 – Town-wide Master Plan
Vision, Mission, Goals and Objectives
V
ISION STATEMENTTo provide a well rounded recreation and leisure experiences for all members
of the community.
M
ISSION STATEMENTThe Township will meet the physical, mental, cultural and social needs of
Pequannock residents by providing the best possible overall park system through
programs, services, facilities and structures and by preserving and developing new and
existing lands and their improvements.
G
OALS AND OBJECTIVES:Goal 1: To improve the quality of life for community residents.
Objective 1.1: Enhance community spaces such as parks, streetscapes and
cultural resources.
?
Statement: Parks, streetscapes cultural resources and environmentalresources help define the character of Pequannock Township. The
Department of Parks and Recreation through the Director in concert with
provide Township agencies and organizations will strive to improve and
maintain these vital resources.
Objective 1.2: Provide community activities and programs.
?
Statement: Providing community activities and programs are essential toencourage healthy active living. The more active Pequannock residents are
the happier and more peaceful residents will be. Healthcare costs will also
be reduced. The Department of Parks and Recreation through the Director
will educate the Pequannock children and adults about healthy alternatives
for their eating and recreation habits and provide them a variety of
recreation opportunities.
Objective 1.3: Address public safety.
?
Statement: The variety of recreation opportunities should be safe toparticipate in. The Department of Parks and Recreation, through the
Director and working with other municipal departments and organizations,
will provide recreation opportunities that are as safe as possible taking into
consideration the inherent risks associated with some recreation
Chapter 2 – Town-wide Master Plan Vision,
Mission, Goals and Objectives
PENNONI ASSOCIATES INC.
Consulting Engineers
6
opportunities. The facilities will be monitored and maintained in that their
use is safe.
Goal 2: Ensure equitable access to safe and attractive parks and
facilities that meet community needs.
Objective 2.1: Enhance/renovate existing facilities to maximize optimal usage.
?
Statement: Existing park lands and structures are a valuable resource tothe Township residents and should be utilized to their highest and best use.
The existing facilities should be continuously evaluated to improve
efficiencies and such improvements should be implemented. The
Department of Parks and Recreation through the Director will identify
possible efficiencies and work towards implementing them as recommended
in the Master Plan.
Objective 2.2: Provide a system of community parks with balanced recreation
opportunities directed to all residents.
?
Statement: A variety of recreation and leisure opportunities, includingpassive and active programs, are important to provide for residents. The
Township should not loose sight of the importance of passive recreation
such as hiking, boating, fishing, gardening, nature study, etc. The
Department of Parks and Recreation through the Director will continue to
provide the varied recreation and leisure opportunities to Township
residents.
Objective 2.3: Increase the number of active recreation facilities available for use
by the Township residents.
?
Statement: Participation in active recreation continues to grow. Sports arebeing played in two or more seasons when they traditionally were played in
one. New sports are gaining in popularity with consistent increases in
participation. Residents are participating in both recreational leagues and
traveling leagues. All of these factors lead to the need for additional fields
to support the interest by the Township residents. The Department of
Parks and Recreation through the Director will work with the Board of
Education to strive to increase usage of their facilities through joint
venture projects as well as acquisition of additional lands that support
active recreational use.
Objective 2.4: Collaboration and partnership with local groups and surrounding
communities and groups for use of facilities and community programs.
?
Statement: The Township of Pequannock has a small land area with manyof its lands ecologically sensitive (wetlands, steep slopes, floodway). This,
factored with the active participation in the recreation programs offered in
Town, makes it difficult the Township to be the sole provider to meet the
demand. The Department of Parks and Recreation through the Director will
continue to work with the Board of Education and local community groups
who provide supporting programs. The Department will also open dialogues
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
7
with local municipalities to evaluate the feasibility to share recreation
facilities. The Department of Parks and Recreation through the Director will
develop a plan to coordinate all recreational opportunities (organizations)
within the Township and neighboring communities.
Objective 2.5: Balance the pro vision of open space with other land uses.
?
Statement: Land is a limited resource. This is even more evident inPequannock Township with the extensive wetlands, floodway and floodplain
within the Township. Other possible land uses should be balanced with the
vision of open space for recreation and resource conservation. When this
is done the value of open space and resource conservation can be seen as
an economic benefit similar to previously typical forms of land
development. The Department of Parks and Recreation through the
Director will work with the Open Space Committee to evaluate possible
land acquisitions for their use as a recreational resource. The Department
of Parks and Recreation through the Director will present possible lands for
acquisition to the Open Space Committee.
Objective 2.6: Expand the local trail system to a local greenway network linking
the Township park system, schools, cultural resources and business district for safe
pedestrian access to all facilities.
?
Statement: A greenway system throughout the Township would provide theopportunity to link the natural environment as well as the human
environment together. Natural habitat becomes more valuable for flora
and fauna when they are contiguous and not isolated pockets. Similarity,
parks and other open space become an even more valuable resource when
they are linked together through a greenway system. The greenway would
provide opportunities to safely travel throughout Town using alternative
means of travel. The Department of Parks and Recreation through the
Director will work with the Open Space Committee and administration in
developing a greenway network throughout the Township.
Objective 2.7: Link the existing Township trail system to Morris County’s trail
system.
?
Statement: Linking the existing trail system and future greenway networkto Morris County’s trail system will further expand the alternative travel
and recreation opportunities for Township residents. The Department of
Parks and Recreation through the Director will actively pursue linkages to
the Morris County trail system.
Objective 2.8: Link Township bike path to Morris County’s bike paths.
?
Statement: Similar to linking the trail system, linking the existing bikepaths to Morris County’s bike paths will further expand the alternative
travel and recreation opportunities for Township residents. The
Department of Parks
and Recreation through the Director will activelypursue linkages to the Morris County bike paths.
Chapter 2 – Town-wide Master Plan Vision,
Mission, Goals and Objectives
PENNONI ASSOCIATES INC.
Consulting Engineers
8
Objective 2.9: Update and implement the Aquatic Park Master Plan in
collaboration with neighboring communities.
?
Statement: Aquatic Park is a valuable resource largely inaccessible toTownship residents. A master plan for the property was previously
completed and should be updated based upon new NJDEP regulations and
recent findings. The Department of Parks and Recreation through the
Director will update the master plan and work with neighboring towns and
the administration in implementing the updated master plan.
Objective 2.10: Provide a recreation center that would address the expanding
indoor programming needs for day care, gym, weight room, large community
meeting room, etc.
?
Statement: Indoor recreation programs are held within the local schools.While this is a good partnership, the available hours are decreasing due to
increasing school programming. The recreation programs are consistently
loosing space and time while the demand continues to rise. The demand
currently exists to support a building dedicated to recreation programming.
The Department of Parks and Recreation through the Director will work
with Township committees, boards and administration to implement a new
recreation center.
Objective 2.11: Provide for specific recreation opportunities (i.e. camping,
fishing, boating, fitness trails).
?
Statement: Pequannock Township’s location at the base of the WaghawMountains and the confluence of two rivers gives Township residents the
opportunity for recreation experiences unique to the Township. These
opportunities should continue to be provided and emphasized as important
to the Pequannock recreational experience. The Department of Parks and
Recreation through the Director will continue to provide and support these
unique, specific recreation opportunities.
Objective 2.12: Support cooperative efforts between the Historic Preservation,
Open Space, Shade Tree and Environmental Commissions.
?
Statement: These Commissions and the Park and Recreation Departmenthave similar and sometimes overlapping goals. These groups should
cooperatively update each other and work together to provide the most
cohesive and efficient results for Township residents. The Department of
Parks and Recreation through the Director will actively work with the other
Commissions to support their efforts and with an emphasis on the
relationship to providing recreation services to the local community.
Goal 3: Actively pursue adequate open space for future recreation
facilities.
Objective 3.1: Update the Township’s recreation and open space inventory (ROSI)
to include all parks and Township owned open space and submit to Green Acres.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
9
?
Statement: Lands listed on the ROSI are preserved as open space inperpetuity. By listing all open space lands, not only parklands, these lands
will be available for use by Pequannock residents for generations to come.
The Department of Parks and Recreation through the Director will update
the ROSI immediately to include existing open space lands and will continue
to update in the future when additional lands are added to the Township’s
open space system.
Objective 3.2: Actively pursue new Open Space lands for recreation
?
Statement: The Department of Parks and Recreation through the Directorwill work with the Township Open Space Committee and administration to
actively pursue Open Space lands. Immediate action will be to further
evaluate the options for the lands identified for acquisition for recreation
use in the Open Space Plan and as recommended within this report.
Objective 3.3: Engage the landowners of agricultural lands to participate in New
Jersey’s farmland preservation program.
?
Statement: The farmland (farmland assessed properties) withinPequannock Township is one of the major defining elements of the
Township’s character. To loose these lands to development would change
the Township’s character forever. The Department of Parks and Recreation
through the Director will work with the Open Space Committee and
administration to open dialogues with the farm owners to try to gain
interest in the States’ farmland Preservation program.
Objective 3.4: Follow-up with the proposal for the Pia Costa tract to act as a
wetlands mitigation bank.
?
Statement: The Pia Costa tract is a valuable ecological resource as thereare significant wetlands on the property and there have been threatened
and endangered plant and animal species sited on the property. It also acts
as flood storage for the Township. With the approval of this property as a
receiving property as a wetlands mitigation bank the wetlands would be
preserved, restored and new wetlands created. The Department of Parks
and Recreation through the Director will work with the Open Space
Committee and the administration to support this property acting as a
wetlands mitigation bank.
Chapter 2 – Town-wide Master Plan Vision,
Mission, Goals and Objectives
PENNONI ASSOCIATES INC.
Consulting Engineers
10
Goal 4: To preserve and enhance the social and ecological
environment for Township residents.
Objective 4.1: Preservation of environmentally sensitive areas. Coordinate these
efforts with adjacent communities.
?
Statement: Disturbance of ecologically sensitive lands has a negativeimpact on the quality of life of Township residents as well as the flora and
fauna in the Township. Disturbance of steep slopes of the Waghaw
Mountains effects soil stability, disturbance of wetlands effects water
quality and disturbance of floodways affects flood limits. The ecological
environment is not limited by governmental boundaries. It is important,
therefore, for all governing bodies that are spanned by the resource to
work together to preserve the resource. The Department of Parks and
Recreation through the Director will actively work with governing boards,
commissions and conservancy groups of Pequannock Township and
neighboring municipalities and county to preserve the ecological resources
in the area.
Objective 4.2: Use environmentally sensitive areas as educational resources.
?
Statement: The numerous ecological resources in the Township provide aunique opportunity to draw the Township residents back to nature. There
are spectacular views from Mountainside Park, possible siting of a state
threatened species, the wood turtle, at Rockledge Park and numerous
opportunities for nature study at Cherry Street Park, Aquatic Park and
others. The Department of Parks and Recreation through the Director will
actively pursue partnership opportunities to thoughtfully develop
environmentally sensitive lands in accordance with regulations and provide
programs with the Board of Education that can meet NJ core curriculum
standards.
Objective 4.3: Preserve historically significant structures and adjoining lands.
Provide a link between the cultural resources to the Township park system.
?
Statement: Pequannock Township retains is character from its colonialroots and has numerous historical structures that remain from that time.
Connecting these sites to the park and open space system can bring
opportunities to educate the public about local heritage and active
recreation at the same time as they travel from one site to another. The
Department of Parks and Recreation through the Director will support the
cultural resources in the Township and work to create a greenway system
that includes the Township’s cultural resources.
Objective 4.4: Educate the public about park resources and park stewardship.
?
Parks help citizens join together to make their communities better byencouraging them to participate in park planning and management. Ties
among community residents can be built and strengthened by bringing
people together, including those who are otherwise divided by race or
class, and by helping them work together on common projects. The
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
11
Department of Parks and Recreation through the Director will continue to
support community involvement in the planning and management of their
parks.
Objective 4.5: Work in conjunction with state open space preservation goals.
?
Open space systems become stronger and more beneficial to local andregional residents the more connections there are to other systems.
Neighboring towns should have a cohesive network that also connects to the
larger county network then the state network. The Department of Parks and
Recreation through the Director will meet or exceed the preservation goals
outlined by the state by working with the Open Space Committee,
administration and through partnerships.
Goal 5: Implement and update the Parks and Recreation Master Plan
(PRMP) so it remains a dynamic guide for the Park and Recreation
Department.
Objective 5.1: Pursue funding through grants, loans, gifts and donations to
implement Township PRMP per the recommendations in the Master Plan.
?
There are many possible partners to provide the recreation resources forPequannock residents, many of which were identified in the
PequannockOpen Space and Recreation Plan
. The Department of Parks and Recreationthrough the Director will work with the administration in pursuing
alternative funding sources to implement the CRMP.
Objective 5.2: Develop capitol improvement plans for 1, 3, 5, and 10 years.
?
Statement: Priorities for improvements and capital expenditures need tobe set to allow for proper planning of expenditures. The Department of
Parks and Recreation through the Director will develop and update capitol
improvement plans for the years noted.
Objective 5.3: Solicit form the community their program and activities wants and
needs and when possible, implement them.
?
Statement: Recreation trends change over time. The CRMP should beupdated approximately once every five years to verify any changes that
should be made to support the current way residents recreate. The
Department of Parks and Recreation through the Director will work with the
community when updating the master plan.
Chapter 2 – Town-wide Master Plan Vision,
Mission, Goals and Objectives
PENNONI ASSOCIATES INC.
Consulting Engineers
12
Goal 6: Management of the park system to the highest standards.
Objective 6.1: Raise the standards of the maintenance operations for all facilities.
?
Statement: When a facility is well maintained it is well respected by theuser and receives more respect and less vandalism, even if it is only in the
form of trash left on the ground. By constantly striving to improve
maintenance the Township staff as well as residents can take pride in the
service that is provided. The Department of Parks and Recreation through
the Director will strive to maintain all facilities to the highest standards
possible. The Department of Parks and Recreation through the Director will
develop and implement a comprehensive maintenance schedule for each
facility.
Objective 6.2: Provide tools and performance standards to manage the
responsibility, authority and accountability of the Park and Recreation Department
and its operations.
?
The Director of the Park and Recreation Department is solely responsibleand has full control of the Department’s functions and operations allowing
for efficiency and full accountability, however, the restructuring and
financial operations of the Department would enable the Director to fully
utilize the tools necessary to provide services to the Department’s
constituents. The director will propose changes to the administration
consistent with acceptable budgeting and accounting standards to provide a
more efficient functioning of the department.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
13
Chapter 3 – Relationships to Other Plans
In the preparation of the Recreation Master Plan for Pequannock Township, many
previously completed reports were analyzed and taken into consideration. These
reports include the 2003 Master Plan Reexamination Report, the Highlands Council
Draft Regional Master Plan, The Pequannock Open Space Plan and the Aquatic Park
Master Plan. The recommendations set forth in the Recreation Master Plan strongly
reflect the goals set forth in these documents.
2003 M
ASTER PLAN REEXAMINATION REPORTIn 2003 a reexamination report for Pequannock Township’s Master Plan was
completed. The purpose of this document was to reevaluate the goals identified
within the Master Plan to ensure that they still reflected current community goals.
Furthermore, it identifies new goals that may have developed since the initial release
of the Master Plan and previous reexamination reports. The implementation of a path
and trail system to better connect the townships parks and open space as well as an
initiative to provide additions and improvements to the current park facilities are the
two major goals set forth in the 2003 Master Plan Reexamination report that address
the deficit of recreational space that currently exists within the Township. Specific
goals listed in the Reexamination Report related to active and passive recreation and
leisure include:
?
Protect the views of the mountains by locating development in areas on oraround the mountains so as not to disturb these views. Emphasize
collaborative work with the Borough of Kinnelon to help preserve this area.
?
Promote a Path and Trail System that will utilize existing trails and, with newlinks, will connect the Township’s parks and open spaces.
•
Solicit an ANJEC grant to convert the railroad right-of-way into a bike path.•
Participate in the Morris Land Conservancy’s Partners for GreenerCommunities.
•
Develop conservancy trail initiatives with Pequannock Township see theOpen Space and Recreation Plan
, specifically regarding bike lanes.?
Limit development along rivers, streams and ditches and around lakes so as tocreate buffers, and where possible, greenways and paths. Coordinate the
conservation of these areas with adjacent communities utilizing conservation
easements and other land protection mechanisms.
•
Aquatic Park along the Pequannock River provides a greenway and pathalong the Pequannock River. Along the length of the river corridor, the
severity of the wetlands and floodplains has caused the area to experience
limited development. In order to protect and enhance the river, its banks,
and the floodplains, an overall plan for river from access and community
Chapter 3 – Relationships to Other Plans
PENNONI ASSOCIATES INC.
Consulting Engineers
14
use should be created. The Township restricts development of
environmentally sensitive lands by restricting construction in flood plains
and enforcing wetland protection laws.
?
Preserve and protect the area of confluence of the Pequannock and WanaqueRivers which include numerous islands and coordinate these efforts with
adjacent communities.
•
See the Open Space and Recreation Plan for more details.?
Protect areas of steep slopes and scenic stream corridors of the WaughawMountains.
?
Promote clean air.?
Support the implementation of the recommendations of the Department ofParks and Recreation regarding additions and improvements to park facilities.
•
The Township of Pequannock has an Open Space Tax for the purchase ofopen space/recreation lands, recreation upgrades of existing facilities and
purchase of equipment.
?
Seek the implementation of a path and trail system through a variety of landprotection mechanisms and public access programs.
•
ANJEC grant application•
The Open Space and Recreation Plan lists a number of possibleprotection mechanisms.
?
Protect and safeguard the aquifer recharge areas and wells through appropriatezoning and enforcement.
?
The Township Zoning Ordinance provides zoning safeguards to protect theaquifer recharge areas and wells of the Township through its regulation of
permitted and prohibited uses.
?
Continue to implement floodplain management policies, regulations andprograms aimed at promoting safety and preventing flood damage.
?
Preserve the Pia Costa tract’s floodwater retention capability.?
Pequannock Township is critically situated in a plain at the base of the NJHighlands at the confluence of the Pompton, Pequannock, and Ramapo Rivers.
The community is ideally located and is important for the linkage and transition
it provides between the rural Highlands communities and suburban
Passaic/Morris County communities. The area is environmentally significant for
the flood plain and water resources is affords, but also for the extensive
wetlands, and wildlife habitat and linkages adjacent to the river that is
provides. Pequannock Township must make it a priority to protect these areas,
expand open space opportunities and provide essential linkages to Township
and regional trails through improvements to Aquatic Park and along the river.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
15
The river and lands adjacent to the river also offer a unique opportunity to both
the community and the region. As such as Aquatic Park along the Pequannock
River are ideally located, but have no parking, signage or improvements. Along
the length of the river corridor, the severity of the wetlands and floodplains has
caused the area to experience limited development. In order to protect and
enhance the river, its banks, and the floodplains, and overall plan for riverfront
access and community use should be created. Such improvements to consider
include property acquisition, trial linkages, and possible playfield.
Highlands Council Draft Regional Master Plan
In August 2004, the New Jersey Legislature enacted the Highlands Water Protection
and Planning Act (Highlands Act) with the goal of protecting and planning for a region
that supplies drinking water for more than 5.4 million New Jersey residents. As a
guide to ensure this goal is met the Highlands Council has issued a draft Regional
Master Plan for public comment before a final plan is adopted. The Highlands region,
which consists of 860,000 acres in 88 municipalities, is divided into two classifications
that are determined by an areas specific level of sensitivity and ecological
significance. The more sensitive areas are defined as Preservation Areas while the less
critical areas are defined as Planning Areas. All of Pequannock Township falls within
the jurisdiction of the Highlands Act. Pequannock Township north of Interstate 287
including Mountainside Park is within the Highlands Preservation area while the
remainder of the Township falls within the Highlands Planning Area.
Land that falls within the Preservation Areas must abide by the regulations of the
Highlands Water Protection and Planning Act. The Planning Areas, on the other hand,
are not required to comply with these regulations although it is strongly
recommended. In fact many municipalities are providing incentives to do so.
Furthermore, these areas each have specific planning goals. Of particular importance
is that the Preservation Areas and Planning Areas share the common goal of preserving
outdoor recreation, hunting and fishing, on publicly owned land. For a complete list
of goals and requirements please refer to the Highlands Council Draft Regional Master
Plan. Another feature of the Highlands Council Draft Regional Master plan is the Land
Use Capability Map which breaks the highlands region down into different zones that
indicate the type of development the land can support. The Land Use Capability Map is
based on an analysis of natural resources, existing development, infrastructure, and
agricultural activities. The map establishes three major geographic zones that overlay
municipal zoning, each with its own criteria and standards. See below for a description
of each:
The Conservation Zone
consists of areas with significant agricultural landsmixed with important environmental features that should be preserved when
possible. There are no lands within Pequannock Township classified as
Conservation Zones.
The Protection Zone
consists of environmentally important lands that arecritical to maintaining water quality, quantity, and other significant ecological
processes. Standards in the zone prohibit the disturbance of natural resources
Chapter 3 – Relationships to Other Plans
PENNONI ASSOCIATES INC.
Consulting Engineers
16
or expansion of infrastructure. Public land acquisition is a priority in the
Protection Zone.
Within Pequannock Township the Protection Zone includes Mountainside Park
and the western portion of the Township whose limits appear to conform to the
eastern wetlands boundaries, Aquatic Park and the Pia Costa Tract.
The Planned Community Zone
consists of areas with existing concentrateddevelopment. These areas are less environmentally constrained, and, with
planning, may support development in a manner and intensity desired by the
municipality. Emphasis will be on increasing land use efficiency, encouraging
the use of previously developed lands through techniques such as
revitalization, adaptive reuse, in fill, and property assemblage. In addition to
zone standards, site specific standards may apply, reflecting the presence of
such natural features as streams or steep slopes. The remainder of
Pequannock Township is located within this zone.
S
TATE DEVELOPMENT AND REDEVELOPMENT PLANThe purpose of the State Development and Redevelopment Plan (State Plan) is to:
Coordinate planning activities and establish Statewide planning objectives in the following areas: land use,
housing, economic development, transportation, natural resource conservation, agriculture and farmland
retention, recreation, urban and suburban redevelopment, historic preservation, public facilities and services,
and intergovernmental coordination
(N.J.S.A. 52:18A-200(f)).The State Plan identified Parks and Natural Areas as a public investment specifically
for resource preservation and the provision of recreational opportunities. Parks and
Natural Areas fulfill a broad range of functions along continuum from resource
conservation to active recreation.
With the delineation of Parks and Natural Areas, the State Plan’s intention is to
protect critical habitats and resources, provide recreational opportunities and create a
connected system of open lands for posterity. According to the map titled “Critical
Environmental Sites and Historic and Cultural Sites” there is a ring of critical
environmental lands that appear to stretch from Mountainside Park along the northern
Township boundary to and including Aquatic Park. Critical Environmental sites are
also located along the East Ditch.
Planning Areas
The State Development and Redevelopment Plan (1) provides a balance between
growth and conservation by designating planning areas that share common conditions
with regard to development and environmental features. Those that are found within
Pequannock Township include:
•
Areas for Growth: Metropolitan Planning Areas Planning Area 1 in the easternportion of the Township.
•
Areas for Limited Growth: Fringe Planning Areas Planning Area 3 is a fingercentrally located pointing southwest to the southern township boundary and
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
17
Environmentally Sensitive Planning Areas Planning Area 5 is within Mountainside
Park area and the westernmost Township boundary. In these planning areas,
planning should promote a balance of conservation and limited growth—
environmental constraints affect development and preservation is encouraged
in large contiguous tracts.
•
Areas for Conservation: Environmentally Sensitive Planning Areas Planning Area5 is within Mountainside Park area and the westernmost Township boundary.
Planning Area 1 Objectives related to Parks and Open Space includes:
?
Natural Resource Conservation: Reclaim environmentally damaged sites andmitigate future negative impacts, particularly to waterfronts, scenic vistas,
wildlife habitats and to Critical Environmental Sites, and Historic and Cultural
Sites. Give special emphasis to improving air quality. Use open space to
reinforce neighborhood and community identity and protect natural linear
systems, including regional systems that link to other Planning Areas.
?
Recreation: Provide maximum active and passive recreational opportunities andfacilities at the neighborhood, local and regional levels by concentrating on the
maintenance and rehabilitation of existing parks and open space while
expanding and linking the system through redevelopment and reclamation
projects.
?
Historic Preservation: Encourage the preservation and adaptive reuse ofhistoric or significant buildings, Historic and Cultural Sites, neighborhoods and
districts in ways that will not compromise either the historic resource or the
area’s ability to redevelop. Coordinate historic preservation with tourism
efforts.
Planning Area 3 Objectives related to Parks and Open Space includes:
?
Natural Resource Conservation: Strategically acquire open space to defineCenters and to maintain contiguous open space corridors that link to other
Planning Areas and Centers.
?
Recreation: Provide maximum active and passive recreational opportunitiesand facilities at neighborhood and local levels by targeting and acquisition and
development of neighborhood and municipal park land within Centers. Provide
regional recreation opportunities by targeting park land acquisitions and
improvements that enhance large contiguous open space systems.
?
Historic Preservation: Encourage the preservation and adaptive reuse ofhistoric or significant buildings, Historic and Cultural Sites, neighborhoods and
districts in ways that will not compromise either the historic resource or the
ability of a Center to develop or redevelop. Outside Centers, coordinate
historic preservation needs with open space and farmland preservation efforts.
Coordinate historic preservation with tourism efforts.
Chapter 3 – Relationships to Other Plans
PENNONI ASSOCIATES INC.
Consulting Engineers
18
Planning Area 5 Objectives related to Parks and Open Space includes:
?
Natural Resource Conservation: Protect and preserve large, contiguous tractsand corridors of recreation, forest or other open space land that protects
natural systems and sensitive natural resources, including endangered species,
ground and surface water resources, wetland systems, natural landscape of
exceptional value, critical slope areas, scenic vistas and other significance
environmentally sensitive features.
?
Recreation: Provide maximum active and passive recreational and tourismopportunities at the neighborhood and local levels by targeting the acquisitions
and development of neighborhood and municipal parkland within Centers.
Provide regional recreation and tourism opportunities by targeting parkland
acquisitions and improvements that enhance large contiguous open space
systems. Ensure meaningful access to public lands.
?
Historic Preservation: Encourage the preservation and adaptive reuse ofhistoric or significant buildings, Historic and Cultural Sites, neighborhoods and
districts in ways that will not compromise either the historic resource or the
ability for a Center to develop or redevelop. Outside Centers, coordinate
historic preservation needs with open space preservation efforts. Coordinate
historic preservation with tourism efforts.
S
TATEWIDE COMPREHENSIVE OUTDOOR RECREATION PLAN(2003)
A Statewide Comprehensive Outdoor Recreation Plan (SCORP) is produced every five
years to serve as a status report, strategic plan and guide for natural and recreational
resource protection and planning within the State. The major goals of the 2003 SCORP
include preserving open space, promoting the development of parks, implementing
policies consistent with New Jersey’s smart growth principles, supporting open space
initiatives of local government and organizations, and to use funding from open space
programs effectively. Furthermore, the 2003 SCORP presents current information on
the supply, demand and need for recreation and open space in New Jersey.
For purposes of estimating the amount of open space required for recreation purpose,
an
approach referred to as the Balanced Land Use Concept has been determined to be
the
most appropriate for New Jersey. The Balanced Land Use approach is a method of
estimating the amount of recreational land that should be set aside by governments in
New Jersey to provide recreation opportunities for the existing and future residents of
the state. According to these guidelines 3% of the land at a municipal level should be
set aside for recreation.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
19
During the preparation of 2003 SCORP seven issues were identified as being necessary
to meet the current and projected future public open space and recreation needs in
New Jersey. The issues stated in this SCORP related to Pequannock Township are:
Land Preservation
Open space is an intricate system serving a variety of functions, often
concurrently, which are essential in sustaining and enhancing New Jersey as a
desirable place to live and work. Open space can protect the quality and
quantity of surface and groundwater resources, guide development and growth,
preserve natural and historic resources, shape community character, and
provide land for recreation. Additionally, the economic value and benefits of
open space have been the subject of several studies. From increasing the value
of adjacent properties and generating revenue from recreational activities to
reducing the cost for public services, the economic impact of open space can
be significant.
Recreation
Recreation providers are finding that while recreation demand is increasing and
contributes significantly to the State’s economy, the benefits it supplies are
not easily dispensed. The demand and need for recreation are being driven
largely by the State’s increasing population. It seems that it is impossible to
build enough soccer fields or softball fields in New Jersey. It also seems
difficult to find a park in the state that does not have a problem with Canada
geese. There is a statewide trend of residents living near parks resisting the
development of recreation facilities, particularly playing fields. Increased
usage translates into greater operational and maintenance costs. Demographic
trends point not only to an increasing population, but also the ongoing aging of
New Jersey’s population.
All of these factors, along with others means that public park and recreation
agencies must continue to provide the programs and facilities to meet an
increasing demand. Annual visitation at state parks tops 15 million and
Monmouth and Somerset counties report annual park attendance of nearly four
million and two million, respectively. At the municipal level, towns struggle
with finding fields for soccer games. That fact and that recreation land often
competes with other land use needs complicates matters even more. It is clear
that the State and local governments must work together to provide for the
parks and recreation needs of its citizens. It is also clear that planning will play
a key role in identifying appropriate lands for recreational development. Local
government open space and recreation plans can guide the acquisition and
development of public conservation and recreation areas to provide a balanced
park system.
Chapter 3 – Relationships to Other Plans
PENNONI ASSOCIATES INC.
Consulting Engineers
20
Greenways
Called parkways or greenbelts in the past, greenways have evolved as an
economical and efficient solution to the need for public open space throughout
New Jersey. Greenways can offer close to home recreational activities such as
walking, running, biking and birding. Those associated with water can provide
canoeing and fishing opportunities. Greenways also can protect
environmentally sensitive areas, link public open space areas, provide wildlife
habitat and preserve community character. Rarely does a greenway serve a
single purpose.
The goals of the Garden State Greenways project are to:
•
Protect New Jersey’s natural resources, water quality, and biodiversity.•
Maintain and enhance large, significant areas of habitat andenvironmentally sensitive lands as part of New Jersey’s green
infrastructure.
•
Contain urban sprawl.•
Link components of the green infrastructure throughout the state toprovide recreational opportunities within walking distance access to
New Jersey residents.
•
Promote public awareness and use of the State’s green infrastructure.•
Foster coordination and partnerships among state, federal, local andnon-government agencies involved in conservation, recreation and land
use planning efforts.
Partnerships
It is hard to imagine open space preservation in New Jersey without
partnerships. In fact, it has become common practice to seek partners to
leverage funding, share project responsibilities or assist in land management
activities. The need for agencies and organizations to participate in partnership
projects in New Jersey is great. The benefits are many but there are also
complications. However, time and again, partnerships prove themselves to be
an important strategy to employ and worth the effort. Simply put, some
projects would not be possible without partnerships. Increased data sharing
among governmental jurisdictions and conservation groups would enhance
preservation and planning efforts.
Stewardship
Both state and local governments are challenged to meet the goal of proper
stewardship of the public’s lands and recreational resources. The State
Department of Environmental Protection manages 64% of all public lands in
New Jersey. Local governments manage 18% of public lands. Though much of
the State land is largely undeveloped, many historic, recreation and education
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
21
facilities are maintained and operated on both state and local lands. Over
many years, funds for the operation and capital needs in recreation areas have
fallen short of the needs. Some local governments use open space taxes for
development and maintenance expenditures associated with their park
systems. In these cases, dedicated funding has given these jurisdictions some
predictability and flexibility to meet the needs to acquire open spaces,
maintain their recreation infrastructure and meet the needs of visitors.
Deferral of capital spending for renovation and rehabilitation can lead to larger
expenses down the road. Some facilities require compliance with disability
access guidelines and some are in need of costly upgrades for environmental
infrastructure projects such as water and sewage systems. Capital needs left
unmet can lead to irreplaceable resource losses, particularly those of historic
significance.
Stewardship at times entails enforcement to protect natural resources. The
increasing popularity of off-road vehicles (ORV) in New Jersey has presented
challenges for the management of public lands and the protection of natural
resources. As ORV ownership has increased in New Jersey and neighboring
states over the past several years, there has been a marked increase in the
unlawful use of these vehicles on public lands. This unlawful usage has caused
extensive damage to sensitive natural areas with no provision for restoration;
has diminished the use and enjoyment of public lands and other natural areas
by other user groups; has diverted resources from other resource protection
priorities; and has created serious risks to ORV users, to the public, and to law
enforcement personnel. By adopting a policy that prohibits ORV use in state
parks, forests and wildlife management areas, and increases fines, together
with increased enforcement, the State has taken an aggressive stance against
unlawful use of ORV on state lands.
Stewardship, however, also involves planning and working with interest groups
to address concerns and find solutions. As part of its ORV policy, the Division of
Natural and Historic Resources will work to develop appropriate recreational
areas for lawful ORV users with the goal of having two new such facilities in
operation by 2005. The New Jersey Trails Council will participate in this effort
by establishing an ORV subcommittee representing a cross-section of interested
environmental, recreational, ORV industry and ORV user groups. No current
state park, wildlife management area or other environmentally sensitive area
will be considered in the site review and selection process.
The Governor’s Council on New Jersey Outdoors has over the years identified a
lack of park operation and maintenance funding as a serious problem
confronting public recreation providers. State public open space and recreation
areas are challenged by rapidly increasing visitation. The Division of Parks and
Forestry has experienced a more than 4.1 million increase in annual visitation
between 1991 and 2001. For those that care about the natural, recreational
and historic resources and for those that have a clear vision of the imperative
to protect open space, it is frustrating to contemplate this question: How can
Chapter 3 – Relationships to Other Plans
PENNONI ASSOCIATES INC.
Consulting Engineers
22
we spend money to protect more open space when we do not take proper care
of the lands and facilities for which we are already responsible?
The answer is that we must do both – balancing fiscal resources for both
preservation and stewardship needs. Many lands that are in public ownership
require very little, in terms of resources, to manage. Others, particularly the
high recreation use areas of parks and some wildlife management areas, need
substantive fiscal and personnel resources. Public testimony to the Governor’s
Council was critical of both local and state governments’ inadequate attention
to the stewardship of public parks and recreation areas. The need to serve the
public through the protection of open space and maintenance of historic and
recreational resources is a critical quality of life issue for New Jersey residents.
P
EQUANNOCK OPEN SPACE AND RECREATION PLANIn 1993 an Open Space and Recreation Plan was developed for Pequannock Township.
This document inventoried the natural, historic, and recreation assets of the Township
and provided suggestions to preserve and expand upon these valuable resources.
The need for additional recreational space was strongly emphasized within the
Pequannock Open Space and Recreation Plan. The plan notes that recreation demand
remains strong and continues growing with an increasing number of residents
participating in sports and suggests the acquisition of additional lands to accommodate
this demand.
The recommendations section of this report identifies specific parcels with the
potential for development into athletic fields. In addition to the shortage of athletic
fields and recreation facilities, the report identifies the need to improve access to
existing facilities as well as increase the amount of parking provided. Within our
recommendations we have provided concepts illustrating how this can be
accomplished. Finally, the report recommends the development of a greenway system
connection the Highlands region in the west to the Rivers on the east. This would
provide increased protection against flooding, provide increased recreational
opportunities along the river and create connectivity between existing parcels of open
space. This improved connectivity would make the existing open space much more
function from both an ecological and use perspective.
A
QUATIC PARK MASTER PLANCompleted in October 2004 by Burgis Associates, the Aquatic Park Master Plan put
forth several goals for the park. These goals included creating a connection with
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
23
existing open space resources in the region, provide unique recreational opportunities
for a diversity of users, ensuring the continued conservation of this ecologically
sensitive area and to provide educational opportunities relation to the environment
and habitat such as wildlife viewing areas. Recommendations for Aquatic Park put
forth in the master plan included improved accessibility and parking, a park
gateway/information kiosk, an amphitheater, a meadow habitat region, an aquatic
habitat region and a river trail, and a woodland habitat region.
The Aquatic Park Master Plan addresses the 40 acres of Pequannock owned land.
Pequannock Township, however, has the rights to develop and manage the 40 acres of
Aquatic Park lands owned by Morris County. It is our recommendation that an update
of the Aquatic Park Master Plan be completed to re-address the goals as well as
provide updated recommendations for the location of the suggested elements and
possible new program elements for the total 90 acres of Aquatic Park.
Chapter 3 – Relationships to Other Plans
PENNONI ASSOCIATES INC.
Consulting Engineers
24
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
25
Chapter 4 – Recreation Standards and
Needs Assessment
I
NTRODUCTIONThere are a variety of methods and approaches that have been used in the past by
different agencies to consider the necessary and appropriate amount and type of
parkland for a given region. The Master Plan presents two different methods for
determining the need for recreational open space, which may be applied to
Pequannock Township.
The methods include 1) an analysis based on New Jersey’s Balanced Land Use
Guidelines and 2) a population –based analysis
The population-based standards set a goal for a finite period of time, which may best
be used for short-term goals. The Land Use standards set their goals in perpetuity,
recognizing that land is finite and any preservation efforts now will benefit all
generations to follow.
It is important to note that the population based analysis does not relate the standards
to the natural resources of the area such as wetlands, stream corridor, wooded areas
and wildlife habitats.
The second analysis looks at recreation activities and the facilities required to provide
these activities. This Master Plan establishes the type and quantity of facilities the
Township should develop in the future. The ultimate goal of this analysis is to
quantify the amount of public open space required to meet the Township’s
recreational needs.
B
ALANCED LAND USE GUIDELINESNew Jersey’s State Comprehensive Outdoor and Recreation Plan identifies the goal for
New Jersey municipalities to provide three percent (3%) of the total developable lands
within the municipality for recreation uses. This balanced land use approach takes
into consideration the extent of wetlands and steep slopes in the municipality and
removes those lands from the total developable lands within the municipality.
According to this methodology Pequannock Township, with its 647 acres of park land,
has preserved fourteen percent (14%) of its overall lands and thirty percent (30%) of
the Township’s developable lands for recreation purposes.
This analysis is unevenly balanced, however, due to eighty-two percent (82%) of the
preserved lands suitable only for passive recreation or resource areas due to wetlands
and steep slopes on the site. So while there is a significant amount of lands preserved
Chapter 4 – Recreation Standards and Needs Assessment
PENNONI ASSOCIATES INC.
Consulting Engineers
26
for recreation purposes the Township does not have a balance between lands suitable
for active and passive recreation.
P
OPULATION-BASED RECREATIONAL OPEN SPACE NEEDSA
SSESSMENTIn 1995, the National Recreation and Park Association (NRPA), in collaboration with
the American Academy for Park and Recreation Administration, published “Park,
recreation, Open Space and Greenway Guidelines.” The revised guidelines
acknowledge that each community is unique, and that it is difficult to apply one set of
special standards to all communities as had been done in the past. Instead, the
guidelines reflect a more systematic planning approach that takes into account the
unique needs, desires and resources of communities as well as changing
environmental, social, economic and demographic trends.
With this framework in mind, the NRPA takes a different approach to park planning,
analyzing the types of parks and facilities require for each individual community, along
with the amount of acreage required to site those kinds of parks and facilities. The
process includes identifying the classifications of parks and the level of service for
each facility within each park classification. Map 2 shows the park and school
locations within Pequannock Township. The guidelines currently being discussed take
into consideration the common shared use of school facilities with Township
recreation programming needs.
Park Classifications
Mini Park
These parks are located within walking distance of the area serviced, and they address
limited or isolated recreational needs. These parks are the vest pocket and tot lots of
the past. Their small size requires intense development and little to no buffer
between the park and adjacent land users is provided. Map 3 identifies the locations
of the Mini Parks within Pequannock Township.
The standards for mini park development are as follows:
Service Area: Ľ mile radius to serve walk-in recreation needs of surrounding
populations.
Acreage/Population Ratio: 0.5 acres per 1,000 persons
Desirable Size: 2500 s.f. to 1 acre
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
27
Potential Facilities:
•
Playground•
˝ Basketball courts open play area•
Picnic tables with grills (no shelter)•
Benches or bench swings•
Landscaped public use area•
Scenic overlookNeighborhood Park
Neighborhood parks are the basic unit of the park system and serve as the recreational
and social focus of the neighborhood. The parks are usually located within walking
distance of the area serviced, and they provide a variety of activities of interest to all
age groups. Creating a sense of place by bringing together the unique character of the
site with that of the neighborhood is vital to successful design. While their small size
requires intense development, fifty percent of each site should remain undisturbed to
serve as a buffer between the park and adjacent land users. Map 4 identifies the
locations of the Neighborhood Parks within Pequannock Township.
The standards for neighborhood park development are as follows:
Service Area: ˝ to 1 mile distance uninterrupted by physical barriers.
Acreage/Population Ratio: 2 acres per 1,000 persons
Desirable Size: 5 to 10 acres
Potential Facilities:
•
Playground•
Court games•
Informal play field•
Volleyball•
Trails/walkways•
Picnic shelters with grill•
Picnic tables with grills (no shelter)•
Benches or bench swings•
50% of site to remain undeveloped•
Parking (7-10 spaces)School-Park
The trend in public agencies is toward joint use. Through joint use the patrons of both
schools and parks benefit for shared use of facilities and valuable land resources.
School-park sites often complement other community open lands, such as Hillview
Elementary School and Hillview Park in the Township. The school park concept
maximizes the joint use concept and provides a planned facility which maximizes
public funds. The school park concept typically varies depending on the school. The
elementary/middle school provides the ideal setting for a neighborhood park. While
Chapter 4 – Recreation Standards and Needs Assessment
PENNONI ASSOCIATES INC.
Consulting Engineers
28
the middle/high school follows the function of a community park or youth sports
complex. Map 5 identifies the locations of the School-Parks within Pequannock
Township.
The standards for neighborhood park development are as follows:
Service Area: Varies depending on school type and park type.
Desirable Size: Varies depending on school type and park type.
Potential Facilities: Varies depending on school type and park type.
Community Park
Community parks provide for the recreation needs of several neighborhoods or large
sections of the community. A range of facilities is typically provided and may support
tournament competition for athletic and league sport or passive recreation. These
parks also present opportunities of nontraditional types of recreation. Fifty percent of
the community park site should be developed for only passive recreation; these
relatively undisturbed areas may serve as buffers around the park and/or act as
buffers between active facilities.
Community parks sites should have varying topography and vegetative communities.
Forested areas should have a variety of tree species. Cleared areas should be present
for siting active recreational facilities. One or more natural water feature(s) such as a
lake, river, or creek is desirable in community parks. Parkland should also be
contiguous and strategically located in order to be accessible to all users within the
neighborhoods it serves. Map 6 identifies the locations of the Community Parks within
Pequannock Township.
The standards for neighborhood park development are as follows:
Service Area: ˝ to 2 mile radius.
Acreage/Population Ratio: 2.5 acres per 1,000 persons
Desirable Size: 30 to 50 acres
Potential Facilities:
•
Recreation center•
Basketball courts•
Tennis courts (lighted)•
Baseball/softball fields•
Multi-purpose fields•
Soccer fields (lighted)•
Swimming pool•
Amphitheater•
Observation decksPequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
29
•
Picnic shelter•
Picnic shelters with grills•
Picnic table with grills•
Benches or bench swings•
Nature trails•
Restroom/concessions•
Parking Playgrounds•
Volleyball courts•
Disc golf•
Lakes•
Paddle boat/canoe rental•
Fishing piers/boat docks•
50% of site to remain undeveloped•
Specialty facilities may be added to, or substituted for, other facilitiesdepending on community needs or special site characteristics.
Sports Complex
Sports complexes function as the major source of active recreation in the community.
They are typically at larger and fewer sites strategically located throughout the
community. Sports complexes should be developed to accommodate the specific
needs of user groups and athletic associations based on demands and program
offerings. Passive recreation opportunities are usually limited, but may be found in
the undisturbed areas, such as within surrounding buffers.
Sites for sports complexes should be relatively flat to alleviate excessive grading of
active facilities. Since most of the land will be developed for athletic fields, sites
without significant vegetation or natural features are acceptable and in some cases
preferable. Sites should be accessible from major thoroughfares. Direct access to
residential areas should be limited and buffers, where adjacent to residential area,
should be provided. Map 7 identifies the locations of the Sports Complex within
Pequannock Township.
The standards for neighborhood park development are as follows:
Service Area: ˝ to 3 mile radius.
Acreage/Population Ratio: 5 acres per 1,000 persons
Desirable Size: 25 to 80 acres
Potential Facilities:
•
Ball fields•
Soccer fields•
Football fields•
Outdoor and indoor skating rinks•
Tennis courtsChapter 4 – Recreation Standards and Needs Assessment
PENNONI ASSOCIATES INC.
Consulting Engineers
30
•
Playground•
Hard courts•
Volleyball courts•
Group picnic area with shelter•
ParkingSupport Facilities:
•
Recreation center•
Tennis center•
Running track•
Amphitheater•
RestroomsSpecial Use Park
The Special use park classification covers a broad range of parks and recreation
facilities oriented toward a single-purpose use. These parks should be viewed as
strategically located community-wide facilities rather than as serving a well-defined
neighborhood or areas. The site should be easily accessible from local and major
roads and centrally located if feasible. The Special Use Parks within Pequannock
Township are Pequannock Valley Park and Woodland Lake.
The standards for neighborhood park development are as follows:
Service Area: Community-wide
Desirable Size: Varies depending on use.
Potential Facilities:
•
Community centers•
Tennis center•
Performing arts facilities•
Public buildings•
Ornamental gardens•
Hockey arenaNatural Resource Area
Natural resource areas are lands set aside for preservation of significant natural
resources, remnant landscapes, open space and visual aesthetics/buffering. These
sites consist of individual sites with natural resources and lands that are unsuitable for
development but offer natural resource potential.
Recreational opportunities include nature viewing and study. Natural resource areas
can also function as greenways. All development should be kept to a level that
preserves the integrity of the resource.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
31
Size and location of the Natural Resource Area will be dependent upon the availability
and opportunity and quality of the site for preservation. Map 8 identifies the locations
of the Natural Resource Area within Pequannock Township.
Examples:
•
Parcels with steep slopes and natural vegetation•
Drainage ways and ravines•
Surface water management areas•
Utility easements•
Wetlands/lowlands•
Shorelines along waterways, lakes, and pondsGreenways
Greenways tie the park system components together to form a cohesive park
environment, they emphasize harmony with the natural environment, allow for
uninterrupted and safe pedestrian movement between parks and other open space
components throughout the community, provide people with a resource based outdoor
recreational opportunity and they can enhance property values.
Greenways can either be “natural” following natural resources or “man-made” built as
part of a development project or during renovation of old development areas such as
an old railroad bed. Existing and proposed greenways are noted in the Township
Master Plan
Desirable Size: 50 to 200 foot width
Potential Activities:
•
Hiking•
Walking•
Jogging•
Bicycling•
In-line skating•
Cross-country skiing•
Horseback riding•
CanoeingChapter 4 – Recreation Standards and Needs Assessment
PENNONI ASSOCIATES INC.
Consulting Engineers
32
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township
Recreation Master Plan
Natural Resource Areas
Information Sources:
New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
BERGEN
PASSAIC
ESSEX
HUDSON
MORRIS
SUSSEX
HUDSON HUDSON
I-80
I-280
I-287
I-95
GARDEN STATE PARKWAY
NEW JERSEY TURNPIKE
I-78
I-287
Legend
Park Boundaries
Major Roads
Natural Resource Areas
Aquatic Park NRA
Hidden Cove NRA
Meyers Brook NRA
Mountainside Park NRA
Pequannock Township
45
Map 8
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
Recreation Need by Park Classification
Level of Service guidelines are set for park classifications except School-Park,
Greenways and Special Use Parks.
Based upon the 2005 census data all of the park classifications that receive a level of
service in Pequannock Township have a deficit to what should be provided. There is a
deficit of eight (8) acres of Mini-Parks, a deficit of eight (8) acres of Neighborhood
Parks, a deficit of sixteen (16) acres of Community Parks and a deficit of fifty-seven
(57) acres of Sports Complex.
Table 2 ~ Parks by classification, standards and deficiencies / surplus
The majority of the Township parks are located in the central to southern area of the
Township. This is most likely due to the location of wetlands and floodplain
influencing the initial settlement of the Township with the first homesteads in the
north central section of town. When parks and recreation development came to the
forefront there was more opportunity to set aside lands for recreation and leisure in
the central and southern part of town. This provides an imbalance to access to the
provided parks and their recreation and leisure facilities. The residents in the
southern and south-central part of the Township have better access to facilities than
those in the north and north-central part of the Township.
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
47
Chapter 4 – Recreation Standards and Needs Assessment
PENNONI ASSOCIATES INC.
Consulting Engineers
48
Two Mini Parks, Lyon and Riverside Parks, and one Neighborhood Park, Lyman Park,
are located in the southeastern corner of the Township. One neighborhood park,
Foothills Park, is located in the northwest corner of the Township. Pequannock
Township has one Community Park, Greenview Park, in the southwestern corner of the
Township. There are two Sport Complexes, Town Hall Field and Washington Park,
centrally located. Hillview Park is considered part of a School-Park as it is adjacent
to Hillview Elementary School and Pequannock Valley Middle School. North Boulevard
and Stephen J. Grace Elementary Schools and Pequannock Township High School are
other School-Parks within the Township (see Map 2 for park and school locations).
While the schools are not managed directly by the Township they are a valuable
resource that should continue to be actively pursued for partnership for recreation
use.
There are four natural resource areas within Pequannock Township, Aquatic Park,
Hidden Cove, Meyers Brook and Mountainside Park. Wetlands can be found on ninety
seven percent (97%) of the land within Aquatic Park, seventy one percent (71%) of
Hidden Cove lands and thirty seven percent (37%) of Meyers Brook’s lands. Steep
slopes of thirty percent (30%) or more comprise ninety percent (90%) of the land
within Mountainside Park. The sensitive lands associated with these parks and the
respective regulations as well as their location and configuration (Meyers Brook) limit
the development opportunities for these parks to passive trail development.
Community parks can provide facilities similar to Neighborhood Parks and Mini Parks.
Neighborhood Parks can also provide facilities similar to Mini Parks.
When evaluating the deficit of park classifications and the typical uses within those
park classes the park classification hierarchy is taken into consideration. For example,
the facilities found in a Mini Park may also be found in all of the other park
classifications except Natural Resource Area and Greenways. This could mean that a
Neighborhood Park can supply the demand for a Mini Park depending upon the location
within the Township.
In addition, School Complexes may also partially supply the demand for certain park
classifications based upon the available facilities and availability for use. In
Pequannock, Stephen J. Grace and Hillview Elementary Schools have playgrounds.
They may act as Mini Parks, Neighborhood Parks or Sports Complexes during non-school
hours.
Mini Parks
Mini Parks and the typical facilities of such parks are well distributed in the southern
section of town. In addition to Lyon Park and Riverside Park, Greenview Park and
Stephen J. Grace Elementary School are in the southern section of town. These
provide the facilities that a Mini Park would and are well distributed in the southern
section of town.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
49
Hillview Elementary School serves as a Mini Park in the center of town. There is a gap
in service for the residents to the south and west of the school.
Two sites in the northern section of the Township provide the facilities found in a Mini
park, North Boulevard School and Foothills Park. Both sites have a playground.
Access to Foothills Park, however, is by vehicle not by foot as there is no safe
pedestrian access to the park. There is a gap in service between Hillview and North
Boulevard Schools north and south and east to west in the Township.
Neighborhood Parks
The Neighborhood Parks are located at opposite ends of the Township (northwest and
southeast). Greenview Park, a Community Park, can serve the need as a Neighborhood
Park. There is a gap in service with no Neighborhood Park in the central or the
northeast section of town.
Community Park
Greenview Park is the only Community Park within the Township. This serves the
residents in the southwest corner of town with a gap in service for the remainder of
the Township.
Sports Complex
Sports Complex should be strategically located within the Township. The current
facilities are centrally located on the eastern side of town.
School Complex
The schools in Pequannock Township are located in the north-south central corridor.
They serve as Mini Parks, Neighborhood Parks, and Sports Complexes. As these lands
are not managed by Pequannock Township they were not included within the
surplus/deficit calculations but will be considered as part of the facility
recommendations.
D
EMOGRAPHIC ANALYSISWe must remember as we go through the planning process for the Township-wide
Recreation Master Plan that we are planning for people. Since the level and quantity
of parks and recreation services demand is directly related to the number of people
demanding the given services, changes in both the number and composition of that
local population affects local government planning. A youthful population makes
different demands on parks facilities than a much older population does, and an
increase in certain cultural groups – Hispanics, for example- can create yet another set
of demands.
Since estimates of population change are crucial to planning, budgeting and financing
park improvements, they are essential to this Master Plan.
Chapter 4 – Recreation Standards and Needs Assessment
PENNONI ASSOCIATES INC.
Consulting Engineers
50
Population
The population in Pequannock Township was in decline in the later portion of the 20
thcentury (Table 3). According to the Pequannock Township Master Plan (1995) the
decline was in large part due to the decrease in household size and a relatively stable
housing stock. The population in the beginning of the 21
st Century is on a slightincrease and the population trend will continue to increase with a projected increase
in 2005 of 12.13% according to projections from the American Community Survey.
1970 1980 1990 2000 2005
Population total
14,396 13,776 12,884 13,888 15,586% change
-4.31% -6.48% 7.79% 12.23%Table 3 ~ Pequannock Township Population Trends
The age of Pequannock Township residents has been shifting over the last forty years
Table 4). There was a big drop in the residents under 5 years of age (-41.10%)
between 1970 and 1980. The total numbers of that segment of the population has
been gradually increasing since then and represents the second greatest change in age
cohort in the Township from 1990 (21.72%). There has been a steady decline in the
residents 5 – 24 years of age from the 1970 through 2000, although in the last 10 years
the decline is relatively insignificant (0.52%). The change in total numbers in the 25-
44 age cohort has shown slight fluxuations from 1970 to 2000. Similarly the numbers
of resident’s aged 45-64 have shown a steady increase over the years since 1970. The
age group that has show the greatest growth in Pequannock Township is those
residents aged 65 and over. This age group has significantly increased since 1970
with the latest increase of 25.38% from 1990, the largest increase from 1990 in any
age cohort.
1970/1980 1980/1990 1990/2000
Age Cohort
Change in
Total Change
Change in
Total Change
Change in
Total Change
Under 5 -484 -41.10% 93 13.40% 169 21.72%
5 - 24 -675 -11.90% -1543 -31.00% -18 0.52%
25 - 44 -137 -3.60% 223 6.10% 199 5.08%
45 - 64 406 13.90% 128 3.80% 298 9.55%
65 and over 316 38.60% 424 37.40% 396 25.38%
Table 4 ~ Pequannock Township Age Cohort Trends
The percent of the total population for each age cohort follows the individual trends
for the change in the total for each age cohort (Table 5). While the greatest changes
in total numbers have been occurring in the under 5 and 65 and over age cohorts they
still comprise the two smallest age groups in Pequannock Township in 2000. Their
increasing trends, however, indicate the need to pay special attention to confirm
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
51
there are adequate facilities for an increasing population in these two age groups.
The age group comprising the greatest segment of the population in 2000 is the 25-44
age cohort. This percent of the total population for this age group has shown slight
fluxuations since 1970. The age group showing the greatest change in the overall
percentages of the total population is the 5 – 24 age cohort, decreasing by almost 15%
since 1970 when it had the greatest portion of the population (39.40%). The last age
cohort is 45-64 which has remained constant over the last thirty years at just over 24%
of the total population.
Percent of Total Population
Age Cohort
1970 1980 1990 2000Under 5 8.18% 5.02% 6.06% 6.82%
5 - 24 39.40% 35.99% 26.99% 24.83%
25 - 44 26.44% 26.44% 30.50% 29.64%
45 - 64 20.29% 24.35% 24.30% 24.63%
65 and over 5.69% 8.20% 12.15% 14.08%
Table 5 ~ Pequannock Township Age Cohort Trends as a Percent of the Total Population
Population density
There are two areas of concern when studying population. The first is the actual
number of people dwelling within the area. The second is the density of this
population, or how closely the actual number of people approaches the number of
planned for during the zoning process. Combined, the two provide important
indicators of the need for the size and location of park and recreational programs and
facilities.
Density figures provide a measure of an area’s degree of development and land
availability. Park and Recreation’s land use view differs somewhat from that of other
Township department: it must look into the future well in advance of build-out to
identify suitable land for acquisition and park development. By the time an area has
reached 50% density, most of the choice recreation lands may well have been taken
for other purposes.
The total acres in Pequannock Township are 4565. In 2000 the population was 13,888
which produces an overall population density of 3.04 persons per acre. The areas of
greatest density generally runs north south between the Newark-Pompton Turnpike
and Boulevard and State Rt. 23 and the southern Pequannock Township Boundary (Map
9). The population continues from Boulevard to the west getting gradually less dense
the further away from Boulevard. The one exception is a residential condominium
development called “The Glen” that lies to the northwest of Sunset Road.
Housing
Chapter 4 – Recreation Standards and Needs Assessment
PENNONI ASSOCIATES INC.
Consulting Engineers
52
Pequannock’s 13,888 residents live in 5,026 housing units. The average household size
is 2.76 people and the average family size is 3.23 people. Of the 5,026 housing units
89.5% (4,497) are owner-occupied and 10.5% (529) are renter-occupied. This
represents a change from the 1999 Census reports with slight increase (1.40%) in
owner-occupied and a slight decrease (10.26%) in renter occupied.
The average household size of a rental occupied unit is 1.88 persons and of an owneroccupied
unit is 2.86 persons. This is a continued decline from the 1990 Census of 2.1
persons and 3.1 persons per rental and owner-occupied housing unit respectively.
Education
Education has been shown to have a high correlation with leisure activity. The higher
the educational attainment, the more activities participated in and the more frequent
the participation. According to the 2000 Census Pequannock Township out of 9,495
residents 25 years of age and older 93.0% earned a high school diploma (including
equivalency), which is comparable to overall Morris County at 90.6% and higher than
overall New Jersey State t 82.1%
In addition out of Pequannock Township residents 25 years of age and older 19.1% had
some college but no degree, 5.8% earned an Associate degree and 37.5% earned a
Bachelors degree or higher. The percentage of Morris County residents 25 years of age
and older earning a Bachelors degree or higher as noted in the 2000 Census is 44.1%
and for New Jersey as a whole is 29.8%.
Income
Income is also tied to recreation participation, the higher the income, the more active
people are in recreational pursuits. In part, income also represents the ability to pay
for recreation activities and to travel to recreation areas.
The 2000 Census evaluates income for households and families. A household is defined
as a group of unrelated people living together. A family is defined as a group of
people related in bloodline living together. According to the 2000 Census the median
household income in Pequannock Township is $72,729. This is 24% higher than the
State household median income of $55,146 and 6% lower than the Morris County
median household income of $77,340. The Pequannock Township median family
income is $84,487. This is 22% higher than the State median family income of $65,370
and 6% lower than Morris County median family income of $89,773.
In 1999, according to the 2000 Census, 534 persons or 3.8% of all people for whom
poverty status was determined, were below the poverty level in the Township. This is
an increase from the 1.366% reported in the 1989 Census (Morris County Master Plan,
1995). According to the 2000 Census 2.5% (96) of the families in Pequannock Township
are below the poverty level, 8.0% (24) of the families with a single mother
householder are below the poverty level and 3.0% (414) of individuals are below the
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
53
poverty level. These percentages are similar to Morris County poverty percentages of
2.4%, 10.0% and 3.9% respectively. The Pequannock Township poverty percentages are
significantly lower than the State’s poverty percentages of 6.3%, 19.4% and 8.5%
respectively.
F
ACILITY NEEDThis Master Plan evaluates the facility demand based upon previous information
discussed in this report, input from the Parks and Recreation Director, the Recreation
Advisory Board and stakeholders. This information as well as analyzing the
geographical location of the facilities was used in developing the facility needs.
Pequannock Township provides a variety of indoor and outdoor recreation and leisure
opportunities for residents. There is a need for additional facilities to support the
demand for these programs.
The outdoor facilities provided include boating, camping, fishing, hiking and nature
trails, picnic areas, ice skating, playgrounds, swimming and athletic fields. The
Township also has a Senior Center. The Township has a need to provide 3-4 additional
soccer/lacrosse fields and one baseball field to meet the growing demand. The other
outdoor activities are adequate in number. There are opportunities to capitalize on
the undeveloped lands to augment these facilities. This, however, is not a priority.
The Township does not have any facilities to support other indoor programs such as
basketball, volleyball, jazzercise, aerobics, little crafters, hands on fun, children’s
ceramics, karate, etc. The Parks and Recreation Department relies on Board of
Education (BOE) facilities for these programs. Time and space for these programs in
BOE facilities is getting less and less over the years as the BOE before school and after
school programming is expanding. The Township needs an indoor facility to continue
to be able to provide the level of programming and services the residents are
accustomed to and the Township has the ability to provide with available facilities.
The Recommendations section of this report lists specific action items to address the
identified needs.
Chapter 4 – Recreation Standards and Needs Assessment
PENNONI ASSOCIATES INC.
Consulting Engineers
54
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Foothills Park
Rockledge Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
Population Density (2000)
Legend
Pequannock Township
Park Boundaries
Roads
Lakes
Streams
Population Per Square Mile
0 - 2000
2001 - 5000
5001 - 7000
7001 - 9000
> 9001
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 9
55
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
Chapter 5 – Inventory and Analysis of
Existing Resources
P
ROCESSExisting information was gathered from several sources; GIS Data from New Jersey
Department of Environmental Protection and New Jersey Geological Society, existing
maps and documents, site visits and staff interviews and discussions.
GIS Mapping
Geographic Information System data was gathered for the following: land use, land
cover, wetlands, surficial and bedrock geology, depth to bedrock, depth to
groundwater, aquifers and sole source aquifers, census data, groundwater recharge
Site Visits
Between June and November of 2006 site visits were conducted for each of the parks
within Pequannock Township to evaluate the existing conditions including quantity and
quality of recreation opportunities provided.
P
EQUANNOCK TOWNSHIP PARK LANDSThe location of Pequannock Township at the
base of the Waghah Mountains and at the
confluence of three rivers gives the
Township a unique opportunity to provide a
wide variety of recreation and leisure
opportunities. Pequannock Township has
fourteen parks totaling 646.6 acres with
sizes ranging from 0.1 acre in Lyon Park to
310 acres in Mountainside Park. The green
highlighted areas in Figure 3 illustrate the
recreation facilities provided by Pequannock
Township. The red highlighted areas on the
same figure are the Township Board of
Education facilities. (See also Map 2 for a
larger scale map identifying each park by
name.) Table 2 on the next page identifies
the size of each park and the amenities
within. This table also identifies those
outdoor facilities owned by the Pequannock
Board of Education whose facilities are used
by the Park and Recreation Department.
Figure 3 ~ Township Park and Board of
Education facility locations.
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
57
Chapter 5 - Inventory and Analysis of Existing Resources
Table 6 ~ Facility Amenities Matrix
PENNONI ASSOCIATES INC.
Consulting Engineers
58
Pequannock Township Town-wide Park and Recreation Master Plan
Aquatic Park
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
59
Figure 4 ~ Meadow area in
Aquatic Park utilized as a
circular track by ATVs.
Figure rea in
Aquatic Park.
5 ~ Forested a Figure 6 ~ Waterway in
Aquatic Park.
and
s.
on the
ails.
is
f
he park due to the
length of trail that would have to be hiked to reach this area.
e
squehanna Western Railway on the west.
rested
The seventy-seven (77) acres of Aquatic
Park provides the opportunity for varied
unique recreation opportunities. These
could include a blueway with canoe portage
points, flora and fauna observation,
demonstration gardens, nature trails,
guided hikes and environmental program
The existing park, however, provides
limited hiking opportunities, whose trails
appear to be utilized heavily by ATVs. As
the majority of the park is classified as
wetlands, the ATVs are disrupting the
environmental ecosystem as well as making it dangerous for people to hike
tr
There is no easy access to the park as the only parking available is north of the park
and patrons must hike to the park prior to beginning their enjoyment of the park. Th
limits the number of people utilizing the facility and increases the possibility of ATV
use with little policing of the ATV activity occurring. It also limits the possibility o
the larger number of patrons accessing the southern limits of t
Cherry Street Park
Cherry Street Park (14-acres) fronts Jefferson Street to
the north, residential to the east and south and th
New York Su
Sixty-nine percent (69%) of site is classified as fo
wetlands with the area fronting New Street nonwetlands.
The City of Newark water supply pipeline
right-of-way (ROW) cuts across the northeast corner of
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
60
Figure 7 ~ Open play area in
Foothills Park. I-287 and
Mountainside Park are in the
background.
Figure 8 ~ Sledding at
Foothills Park.
Figu at
Foothills Park.
oted ROW,
owever, can be utilized for this purpose.
oothills Park
hip and
es
ea
ke it
ated at the foot of the I-287
mbankment restricts access to the pond from the east.
It is
f
rk
from
the park. There is no designated access point into this park. The n
h
F
Foothills Park (27-acres) is located in the
northwestern portion of the Towns
abuts I-287. It is separated from
Mountainside Park by I-287. The park
provides a playground and opportuniti
for open play in the field from spring
through fall and sledding in the winter.
There is a man-made pond about fifteen
feet below the parking grade. The only
access to the lake is from the parking ar
across a lawn down a desire path to the
pond edge. The existing grades along
West Parkway at about twenty to twenty-five feet above the pond grade ma
difficult to access. In addition, a police training range loc
e
re 9 ~ Playground
Greenview Park
Greenview Park (31-acres) is
located in the south-western
portion of the Township.
surrounded by residential
development on the north,
east and south and Lincoln
Park Airport on the east side o
Beaver Brook Road. The pa
does not have access
Beaver Brook Road.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
61
Figure 12 ~ Greenview Park
tennis courts and attendant
station.
Figur ark
playground area.
e 13 ~ Greenview P Figu ark
restroom facility.
and
nd in
League fields, tennis courts,
strooms and parking.
n. Some
ass
estrooms are functional, however, should be updated.
e with swimming. As such, no boating will be able to be
g agreement to allow limited parking for residents who want to
ccess Hidden Cove.
This park is one of the larger parks in the Township
provides a variety of passive and active recreation
amenities. The following amenities can be fou
Greenview Park: handball courts, ice skating,
lacrosse/soccer fields, picnic area, playground, pond,
sledding, softball/Little
Fig
re
In general the amenities are in good conditio
amenities require maintenance and general
improvements to address high use and site drainage
issues. The softball field is in overall good condition
requiring annual maintenance on the infield and gr
areas. The soccer / lacrosse fields are in need of
regrading, seeding/sodding and irrigation to begin to
address the high use of the fields. The playground
area drainage needs to be addressed as it appears
water drains through the playground area. It also
appears the decomposition of the safety surface is
accelerating possibly due to this as well as ground
water. The tennis courts are in good condition. The
ure 10 ~ Greenview Park
soccer/lacrosse field.
Figure 11 ~ Greenview Park
Softball/Little League field.
r
re 14 ~ Greenview P
Hidden Cove
Hidden Cove (20-acres) is located at Lincoln park Road and
Boulevard. It consists of a portion of a lake and wooded area a
portion of which has wetlands. This facility is used for fishing and
hiking. The lake is connected to Lincoln Park’s swimming facility.
As such, the uses on Pequannock Township’s side will have to remain
compatibl
allowed.
There is poor access with no on-site parking and poor parking
availability on adjacent roadways. The adjacent land owner is not
open to a shared parkin
a
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
62
Hillview Fields
Figure 15 ~ Hillview Field
softball/little league field.
y
,
is
s
the fields located to the
me to “rest” and regenerate. The
fields and fencing are in fair condition. The parking lot is in good condition.
arcels located in
ntral of the park area.
l
he
a
e has poor
drainage and takes several days to dry out after a normal rain event.
Hillview Fields (11-acres) is located in the south-central
portion of the Township. It is contiguous with Hillview
Elementary School to the west and Pequannock Valley
Middle School to the north. Located on the propert
are three softball/little league fields, a baseball field
parking and the Township library. The parking lot
shared with Hillview Elemen
Elementary School also ha
a playground that is near
tary school. Hillview
north of the school building.
The fields are in fair to poor condition. They receive
heavy use from both softball/baseball and
soccer/lacrosse teams. The grass is in poor condition
from overuse and no ti
in
Lyman Park
Lyman Park is twenty (20) acres of undeveloped
park land in the southeast corner of the Township.
It is surrounded by residential development. In
addition there are residential our-p
the north ce
The park is primarily forested with a small centra
clearing. Access is from Hampton Avenue off of
Roosevelt Street. Fifty-one percent (51%) of the
lands are wetlands. Those that are not include t
central clearing and residences and the eastern
portion of the site. Existing amenities include
playground, open play area and parking along the cul-de-sac. The sit
Pequannock Township Town-wide Park and Recreation Master Plan
Figure 18 ~ Residential outparcels
in Lyman Park.
Figure 17 ~ Hampton Avenue
access.
Figure 16 ~ Lyman Park
clearing and playground in
trees.
Lyon Park
Lyon Park is a mini park located on a single lot on Hilton
Street at E. Franklin Street. The amenities include
playground equipment and benches. They are in good
condition.
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
63
Figure 19 ~ Lyon Park
ayground equipment.
d
pl
Meyers Brook
Meyers Brook is a narrow band of twenty-six (26) acres of
land that follows a tributary of the Pompton River locally
called Meyers Brook. It is located in between backyards
in the residential east-central portion of the Township.
It connects with Pequannock Valley Park and Woodlan
Lake. There are no recreation amenities in this park.
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
64
Mountainside Park
Mountainside Park is located in the northwest corner of the
Township. It is cut off from the remainder of the
Township by I-280. Access to the park is from Mountain
Avenue Drive. Mountainside Park consists of three hundred
and ten (310) wooded acres, hiking trails, camping area,
views of the Pequannock Valley and a small parking area.
The trails are varied in the section north of the parking lot
and east of the utility easement. These trails are blazed
but some are overgrown and unclear. There were no
apparent trails to the south of the parking lot or west of
the utility easement. Students travel to the park to study
the geological formations found there.
Figure 20 ~ View from
Mountainside Park
Figure 21 ~ Trail and marking
at Mountainside Park.
Figure 22 ~ Mountainside Park
camp area
Pequannock Valley Park
Pequannock Valley Park is the Township’s only
to be
ls,
a portion of
d
swimming facility. There is a membership fee
able to utilize the twenty-seven (27) acre facility.
Recreation amenities include a pond with a sand
beach, playground area, picnic areas, nature trai
basketball court and parking.
The lake was created by damming
Woodland Lake. The dam is required in order to
regulate the water quality. This dam has receive
repairs recently and is in need of additional repairs, in the amount of approximately
$250,000, within the next five years. The remaining amenities are in good condition
but have not been updated.
Pequannock Township Town-wide Park and Recreation Master Plan
more
nt may
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
65
Figure 23 ~ Pequannock Valley
k swimming lanes.
Figu
Pe
re 24 ~ Members entering
quannock Valley Park.
Figure 25 ~ Pequannock Valley
Park picnic area with lake in
the background.
Par
Riverside Park
Riverside Park (2 acres) is located adjacent
to the Pompton River in the southeast corner
of the township. This wooded site has views
of the river and Wayne Township. There is
also a piece of playground equipment and
benches.
Rockledge Park
Rockledge Park (21-acres) is located on Sunset
Road with access also from Farm Road and Coopers
Court. The majority of the site is forested with
the area off of Coopers Court an open grass area.
Sixty seven percent (67%) of the site is classified as
wetlands with the eastern finger extending
towards Sunset Road not classified as forested
wetlands. These same areas are New Jersey
Landscape Project Rank 3 for the wood turtle.
The wood turtle is a state threatened species.
Rank 3 indicates that there have been one or
occurrences of sighting the species. The
possibility of the wood turtle on site will require further studies to be completed prior
to any site development. Based upon the study findings the site’s developme
be restricted.
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
66
Town Hall Field
Town Hall field is located on Township property
behind Town Hall off of the Newark Pompton
Turnpike. Recreation amenities on this site include
baseball field, two basketball courts, a gazebo, picni
table, the Senior Building and parking. Also on th
site include the Township Police Headquarters and
First Aid Squad.
a
c
e
the
The baseball field is in good condition. The grass has
irrigation and has helped the playability of the field.
The infield is oversized. The basketball courts need resurfacing. This is scheduled as
a 2007 capital improvement. Cars park on the current courts during the winter time.
Figure 26 ~ Town Hall baseball
field.
Figure 27 ~ Town Hall
basketball courts.
Washington Park
Washington Park is located off of Jefferson Street across from Cherry Street Park.
Access to the park is also from Adams Street to the eastern parking lot and Washington
Street to the western parking lot.
The fourteen (14) acres of Washington Park are an athletic complex with three
softball/little league fields, scoreboard buildings, concession building and parking. All
three fields have sports lighting and irrigation. The ball
fields are all in good condition. The eastern parking lot is
in good condition. The western parking lot has several
large puddles after a normal rain. The paving is also in
need of replacement.
Other uses within the park include the Pequannock
Township Department of Public Works (DPW)and Animal
Control. DPW is using almost half of the park as a
construction debris dumping yard and for material and
equipment storage. This area is the first thing seen as you
Figure 28 ~ Washington Park
southern ball field.
l
Pequannock Township Town-wide Park and Recreation Master Plan
enter the park from the main entrance off Jefferson Street. Construction traffic uses
this entrance to access the DPW yard. This has damaged the entrance road and
parking area. The animal control building is on the northern boundary of the park.
Figure 30 ~ Washington Park
concessions building.
Figure 31 ~ Washington Park
northern ball field.
Figure 29 ~ DPW dumping area
in Washington Park.
Woodland Lake
The majority of the forty (40) acres of the Woodland Lake
property is the lake itself. The lake is accessed off of
Alexander Avenue into a gravel parking area. The lake is
used for fishing and boating. There is a desire path along
the southern lake edge that connects to what appears is
access from the Rt. 23 interchange to a property north of
Woodland Lake. Woodland Lake is contiguous with
Pequannock Valley Park and Meyers Brook.
The gravel entrance drive and parking area are in fair condition. The boat launch and
the eastern lake edge are in poor condition. Other amenities include benches and
views.
Figure 32 ~ Woodland Lake
boat launch and gravel
parking area.
Figure 33 ~ Trail around Figure 34 ~ Woodland Lake
Woodland Lake
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
67
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
68
P
EQUANNOCK TOWNSHIP BOARD OF EDUCATION LANDSPequannock Board of Education (BOE) has three elementary schools, one middle school
and one high school that is manages for the residents of Pequannock. The athletic
fields at all of the elementary schools and the middle school are used also for
Township Park and Recreation Department programs. These schools are also utilized
for the indoor programming.
O
THER RECREATION OPPORTUNITIESMorris County operates the 18-hole Sunset Valley Golf Course located adjacent to I-287
off of West Sunset Road. This course, designed by Hal C. Purdy, is regarded as one of
the premier golf courses in New Jersey. It is a par 70 - 6,483 yard course and “offers
one of the most breathtaking views in Morris County”.
N
ATURAL RESOURCESNew Jersey Landscape Project
The NJDEP completed the New Jersey Landscape Project (NJLP) in 1994 with the
primary goal “to protect New Jersey’s biological diversity by maintaining and
enhancing imperiled wildlife populations within healthy, functioning ecosystems”. By
combining imperiled and priority species location information with land-use/landcover
data, NJDEP was able to provide a comprehensive guide to allow individuals and
agencies to make ecologically responsible decisions regarding land-use in New Jersey.
It is important to note that the data contained within the NJLP was specifically
designed to function as a planning tool and carries with it no regulatory implications.
The Landscape Project divides habitat patches into five (5) critical area classifications
based on the number of occurrences of State or Federal priority, threatened and
endangered species. These critical area rankings are as follows:
Rank 5 Assigned to patches containing one or more occurrences of at
least one wildlife species listed as threatened or endangered on
the Federal list of endangered and threatened species.
Rank 4 Assigned to patches with one or more occurrences of at least one
State endangered species. (none in Pequannock Township)
Rank 3 Assigned to patches containing one or more occurrences of at
least one State threatened species.
Rank 2 Assigned to patches containing one or more occurrences of at
least non-listed State priority species.
Rank 1 Assigned to patches that meet habitat-specific suitability
requirements, such as minimum size criteria for endangered,
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
69
threatened or priority wildlife species, but that do not intersect
with any confirmed occurrences of such species
Of these five classifications, Rank 5 is the only one that does not exist within
Pequannock Township. Each rank is further divided by habitat type based on land
cover data. Five (5) distinct habitat types were identified within Pequannock
Township including: Forest, Grassland, Emergent Wetland, Forested Wetland, and
Wood Turtle Habitat. See map titled NJ Landscape Project (Maps 10-14). The
following are the critical area/habitat type combinations that can be found within
Pequannock Township.
Forest
Within Pequannock Township Rank 2, Rank 3, and Rank 4 priority areas within the
forest habitat were identified. The Rank 2 Priority Species forest is present as a single
patch within Aquatic Park at Pequannock Township’s Northwest corner. Rank 3
Forested Areas are present along much of Pequannock Township’s Western half and
encompass most of Rockledge Park and parts of Greenview Park.
Grasslands
Grasslands as defined by the New Jersey Landscape Project materialize within
Pequannock Township as of a single patch located just north of Route 504 and to the
West of West Parkway. This patch does not fall within any of Pequannock Township’s
existing parks.
Forested Wetlands
Forested wetlands, most of which are Rank 2, are found in abundance throughout
Pequannock Township. Rank 1 Forested Wetlands straddle Pequannock Township's
western border and are present minimally within Mountainside Park. Rank 2 Forested
wetlands are located throughout the township and are typically located adjacent to
the Pompton River as well as the East and West Ditches and are found in many of
Pequannock Townships Parks including Rockledge, Greenview, Cheery Street, Lyman,
Myers Brook, and Aquatic. It is important to keep in mind that although the NJLP does
not carry any regulatory weight, all areas identified as forested wetlands within
Pequannock Township are subject to NJDEP wetlands regulations.
Emergent Wetlands
Both Rank 1 and Rank 2 Emergent wetlands can be found minimally within Pequannock
Township. There is a small portion of Rockledge Park’s southwest corner classified as
Rank 1 while much of the northern boundary of Aquatic Park falls within this
classification. It is important to note that although these areas are not classified as
wetlands by NJDEP, they are likely to still exhibit some of the characteristics of
wetlands, such as poor drainage and wet soil.
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
70
Woodland Turtle Habitat
Much of Pequannock Township’s southwestern corner is comprised of Rank 3 Woodland
Turtle habitat for threatened species. The only park that this area is present in is
Rockledge Park which consists of about 95% of land classified as Rank 3 Woodland
Turtle Habitat.
Environmental Resource Inventory
In September 1995 Thonet and Associates completed an Environmental Resource
Inventory (ERI) with the help of the Pequannock Environmental Commission. This
Master Plan will summarize the environmental inventory findings from the ERI. The
ERI should be consulted for more detailed information. Inventory findings have been
augmented with data that has been made available since the ERI was completed.
Topography
The largest portion of Pequannock Township is very flat, having elevations that vary
between 180 and 200 feet above mean sea level. In the northwestern corner of the
Township from the western portion of Mountainside Avenue west elevations begin at
about 200 feet and climb up to 734 feet at the top of Pequannock’s Turkey Mountain,
aka Pequannock Knob. These high elevations provide excellent views of Pequannock
Valley and they are viewed from several locations within the Township.
Geology
Pequannock Township lies within the Mesozoic Piedmont and the Precambrian
Highlands New Jersey geographic provinces. The Ramapo Fault separates the
provinces in Pequannock (Map 15). The Ramapo fault is a series of smaller, parallel
faults running in as southwest-northeast strike. The oldest rocks found in Pequannock
are the Precambrian gneisses. Fine-textured sediments were deposited on the Glacial
Lake Passaic lake bottom forming an impermeable cap which confines Pequannock’s
subterranean aquifer, the source of most of the township’s drinking water (Map 16).
In Pequannock, pockets of till can still be found with giant boulders (glacial erratics)
on top of the peaks of the Highlands. The valley, however, is mostly filed with
fluvoglacial deposits dropped by torrential melt water streams and moraine-dammed
Glacial Lake Passaic sediments.
Soils
Soils in Pequannock Township range from gravely stony soils to mucky soils (Map 16).
Approximately fifty-two percent (52%) of the soils in Pequannock Township are
classified as Urban Lands, are part of the Riverhead-Urban land-Pompton association,
whose boundaries generally conform to the developed areas within the Township.
These soils consist of wet organic soils, wet clayey soils, and wet or dry gravelly sandy
loams. They are underlain by stratified or lacustrine sediment are in basins, on low
plains, or on terraces. This association consist of deep, well drained to somewhat
poorly drained, nearly level or strongly sloping gravelly sandy loams and sandy loams
that overlie stratified outwash sand and gravel on outwash plains and terraces. The
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
71
Pompton and Riverhead soils are in the higher elevations within the low-lying areas in
the western section of the Township.
Approximately fifteen percent (15%) of the soils are part of the Rockaway-Hibernia-
Urban land association. These soils are deep, well-drained to somewhat poorly
drained, gently sloping to steep gravelly sandy loams and stony to extremely stony
loams and sandy loams that overlie granite gneiss on uplands. These soils are
generally found in the northwest section of the Township in the area of Mountainside
Park.
Approximately twelve percent (12%) of the soils in the Township are in the Carlisle-
Parsippany-Preakness association. This association was also formed in glacial land
sediment or outwash. Soils in this association are deep, poorly drained and very
poorly drained, nearly level mucks silt loams, and sandy loams that overlie stratified
lacustrine sand, silt, and clay or stratified outwash sand and gravel in depressions or
along low-gradient streams.
The following is specific soils information regarding the sites identified in the
OpenSpace and Recreation Plan
as possible for athletic fields.Rockledge Park
CarAt-Carlisle muck, frequently flooded (85%) , frequent ponding (saturating soil up to
one (1) foot in depth, for long periods of time except in July and August, brief
flooding, high water table at grade.
PrkAt – Preakness sandy loam – poorly drained brief flooding and ponding year round
lasting for brief periods (saturating soil up to one(1) foot depth), depth to high water
table at to 6” below grade.
PrsdAt – Preakness dark surface variant sandy loam – rarely occurring, long lasting
periods of ponding year round (saturating soil up to 0.4’ depth), frequent but brief
periods of flooding year round, high water table at grade to 6” below grade.
Aquatic Park
PbphAt – Parsippany, sandy loam substratum – Frequent periods of flooding and
ponding in the spring lasting for brief periods (saturating soils up to one (1) foot
depth), occasional periods of ponding for brief periods and no flooding in the fall, high
water table at to one (1) foot below grade in the fall to spring with the high water
table dropping to one to two feet below grade in July and August.
Riverside Park
UR – Urban land – No flooding.
Lyman Park
CarAt-Carlisle muck, frequently flooded (85%) , frequent ponding (saturating soil up to
one (1) foot in depth, for long periods of time except in July and August, brief
flooding, high water table at (above) grade.
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
72
Woodland Lake
PrkAt – Preakness sandy loam – poorly drained brief flooding and ponding year round
lasting for brief periods (saturating soil up to one(1) foot depth), depth to high water
table at to 6” below grade.
USHRVB – Urban Land – Not flooded., not rated.
UR –Urban Land – not rated
Hydrology
Pequannock Township’s principal open waters include the Pequannock River, the
Pompton River, East Ditch, West Ditch, and Sawmill Creek. The Pompton River is
formed as the Pequannock and Ramapo Rivers converge, and flows southerly for about
seven miles into the Passaic River in Lincoln Park. It marks the eastern boundary of
the Township of Pequannock and the Pequannock, Ramapo, Wanaque River and
Pompton Rivers are all tributaries of the Passaic River (Map 17).
Pequannock Township sits atop three distinct watersheds; the Pompton River, which
comprises approximately 90% of the Township’s area , the Pequannock River which
comprises a great majority of the remaining area along the Township’s northern
border, and the Ramapo River Watershed which occurs minimally at the Pequannock’s
northwestern corner.
Development implications related to Pequannock Township’s surface hydrology include
regulations regarding flood hazard areas, net fill, trout production waters and
wetlands. Regulations regarding groundwater hydrology include community wellhead
protection areas.
Surface Hydrology
Low lying areas of Pequannock are subject to periodic flooding caused by the overflow
of the Pompton, Pequannock, and Ramapo Rivers, the East and West Ditches and
tributaries to the East Ditch.
Food hazard areas: The floodway is the channel of a stream/river, plus any adjacent
flood plain areas, that must be kept free of encroachment so that the 100-year flood
can be carried without substantial increases in flood heights. The area between the
floodway and NJDEP’s Flood Hazard Area boundaries is termed the flood fringe. The
flood fringe encompasses that portion of the flood plain that could be completely
obstructed without increasing the water surface elevation of the 100-year flood more
than 0.2 foot at any point, with such encroachment not increasing the magnitude of
the peak flows. Map 18 identifies the flood hazard areas within the Township.
Net fill: Grading during land development is regulated along open waters. In the
Central Passaic Basin, grading must not exceed zero net fill (overall soil quantities
must meet existing volume prior to development), and for the remaining food plains in
the western part of the Township north of Jacksonville Road, the maximum net fill
allowance is twenty percent.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
73
Trout production waters: All of the streams in Pequannock are classified by NJDEP as
Fershwater-2 Non-Trout (TW2-NT) waters. In all FW2-NT waters, the designated uses
are:
1. Maintenance, migration and propagation of the natural and established biota;
2. Primary and secondary contact recreation;
3. Industrial and agricultural water supply;
4. Public potable water supply after such treatment as required by law or
regulation;
5. Any other reasonable uses.
Groundwater Hydrology
Groundwater is subsurface water occurring in fully saturated soils and geologic
formation, not as isolated bodies of underground water, but rather as integral parts of
the hydrologic cycle (see the ERI for more details on the hydrologic cycle). Map 19
identifies the differing rates of groundwater recharge in the Township.
Community Wellhead Protection Areas: A Well Head Protection Area (WHPA) in New
Jersey is a map area calculated around a Public Community Water Supply (PCWS) well
in New Jersey that delineates the horizontal extent of ground water captured by a
well pumping at a specific rate over a two-, five-, and twelve-year period of time.
WHPA delineations are conducted in response to the Safe Drinking Water Act
Amendments of 1986 and 1996 as part of the Source Water Protection Program
(SWAP).
Water Supply
Pequannock Township acquires their water from 4 sources; 3 high volume wells,
Newark Water Supply Aqueducts, Lincoln Park, and Riverdale. The Township relies on
the 3 wells for 96 % of its water supply. The wells are located in the north portion of
the Township. The Newark Water Supply Aqueducts are use for a back up to the wells
as well as the connection to Lincoln Park’s water supply. The Riverdale’s water supply
connection is used as an emergency connection. Map 20 locates the Township’s water
supply wells and the aquifers underlying the Township.
Wastewater Disposal
Pequannock Township is serviced by the Two Bridges Sewer Authority that is located in
Lincoln Pak. Many of the homes are not connected to this sewer system and rely on
septic systems. With in the township there is only one treatment plant located at the
Plains Plaza Shopping Center, however this is a privately owned facility to be used only
by the shopping center.
Land Cover
Pequannock Township is considered fully developed. Those lands that are not
developed have environmental constraints associated with them. Map 21
identifies the different land cover types within the Township.
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
74
Vegetation and Wildlife
Forest
The natural vegetation in Pequannock is typical for the geographic region with four
types of forest that are prevalent within the town. Chestnut forest, mixed oak forest,
sugar maple hardwoods forest, and hemlock mixed hardwoods forest; each with their
on distinctive characteristic. The chestnut forest is found in the highlands region along
ridge tops, slopes, and outcroppings. The mesic uplands is the area were the mixed
oak forest, sugar maple hardwoods forest, and hemlock mixed hardwoods forest are
found. Further information on what type of vegetation in the types of forest can
found in Pequannock Township Environmental Resource Inventory.
Wetlands
Wetlands means those areas that are inundated or saturated by surface or
groundwater at a frequency and duration sufficient to support, and that under normal
circumstances do support, a prevalence of vegetation typically adapted for life in
saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and
similar areas. Wetlands play an essential role in the overall well being of the
environment and provide natural habitats. Approximately 16% of Pequannock Township
is wetlands most of which are protected open space.
Wildlife
The Wildlife found in Pequannock is typical for the geographic region, a list of specific
species can be found in Pequannock Township Environmental Resource Inventory. The
variety and abundance of wildlife population is a clear indicator that other aspects of
the natural environment are relatively stable. According to New Jersey Department
Environmental Protection (NJDEP) there are woodland turtles within Pequannock
which are a threatened and endangered species. There are several federal and state
regulations protecting the woodland turtle and its habitat including the Endangered
Species Act (ESA) and the Habitat Conservation Plans (HCP).
Existing Parks Developable Lands
An evaluation of the natural resources of the existing park lands has identifies several
environmental factors that will impact the ability to expand existing facilities or
develop currently undeveloped park lands. These environmental factors include
wetlands, steep slopes and floodway locations. Each of these factors has regulations
restricting development in areas where they are located. Table 7 identifies these
constraints per park and the overall impact on the amount of land available for
unrestricted development.
Pequannock Township Town-wide Park and Recreation Master Plan
Table 7 ~ Environmental factors effecting park land development
The fertile valley at the confluence of three rivers that was so appealing for settlers
brings with it the associated river floodways and wetlands. The majority of the
Township’s park lands are greatly affected by these environmental factors. Only those
facilities centrally located in the Township are unaffected. In general, wetlands may
not be filled or altered. The development of trails, however, is permissible by permit
from the New Jersey Department of Environmental Protection (NJDEP). No
development is allowed within floodway limits. Steep slopes may be regulated by
ordinance as well as best management practices and in this instance the Highlands
Act.
A
IR QUALITYAir pollution has been a growing concern among many environmentalists within the
last several decades. With words such as greenhouse gases, the ozone, and global
warming becoming part of everyday conversation within the past several years a vaster
segment of the population is concerned about air quality. New Jersey air quality has
improved since the passage of the Clean Air Act in 1970. One of the major pollutants
that remains a concern in New Jersey in acid rain with pH level ten times higher then
that which naturally occurs. To date there are no regulation to set an air quality
standard for acid rain.
N
OISE LEVELSNoise is classified as a pollutant because by definition it is an unwanted sound and can
affect the health and well being of people and the enjoyment of property. The three
leading causes of noise are Route 287, Route 23, and Lincoln Park Airport.
C
ONTAMINATED SITESPequannock Township has 21 contaminated sites as listed in the NJDEP
publication
Known Contaminated Sites in New Jersey, 7th edition. The siteslisted are confirmed to have soil and/or groundwater contaminants.
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
75
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
76
C
ONNECTIVITY OF OPEN SPACE SYSTEMPequannock Township’s open space system lacks a cohesive connective system such as
a greenway system or bicycle paths. The parks, board of education properties,
township owned lands, other public lands, cultural resources, and environmental
resources are not distributed evenly throughout the township.
The majority of the parks within the Township are located in the central to southern
area of the town. The two largest parks Mountainside Park and Aquatic Park are
located in the northern portion of the Township and both parks are separated from the
town by a major roadway, interstate highway 287 separates Mountainside Park and
Route 23 separates Aquatic Park. Mountain Avenue is the only access to Mountainside
Park within Pequannock. No other access is available within the town due to interstate
highway 287 traversing the northwest corner of Pequannock Township. Aquatic Park
located in the northeast corner of the township is separated from the nearest
residential neighborhood by Route 23 with no pedestrian access other then crossing
the highway. The other parks are within the residential neighborhoods and are
relatively accessible to the community.
The schools are evenly distributed throughout Pequannock with the elementary
schools in the northern, central, and southern sections and the Middle and High
schools are centrally located.
The County owned Sunset Valley Golf Course is located on the west side of the
township with part of the course in the Borough of Kinnelon. The entrance to the golf
course is located on West Sunset Road within a residential neighborhood.
The cultural resources of the Pequannock refer mainly to the historic sites. These sites
are located throughout the Township with a majority of the site located on Newark
Pompton Turnpike.
Pequannock has a verity of environmental resources from the 720-foot vertical peek at
Mountainside Park to the Pompton and Pequannock rivers that create the natural
eastern border of the township. The largest of these environmental resources are the
preserved wetlands. The wetlands play an integral part in the environmental well
being of not only the town but the inter state. These preserved areas are sanctuaries
for wildlife within the ever-expanding urban environment. The wetlands also act as a
natural filter for storm water prior to the water entering the second largest
environmental resources of the township the rivers, streams, lakes, and ponds. These
water bodies are both a fundamental part of the uniqueness of Pequannock as well as
the town’s park system. Sixty percent of the parks are associated with one or more of
these water bodies. The vitality of these water bodies is also important to the entire
state because they provide refuge for migrating waterfowls and other wildlife. The
variety of environmental resources are also an excellent educational tool for the
residents of Pequannock.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
77
Although Pequannock Township has an array of open space resources, one critical
element is missing. A cohesive path/ trail system to link Pequannock open space
elements together. Several systems can be used to fill this void such as a greenway or
bicycle path. The goal of the path system is to link the varies open spaces making
them assessable by walking or bicycle, therefore eliminating the necessity of
Pequannock residence to drive in order to enjoy the open spaces of the Township.
A greenway is a multi-purpose linear route usually a railroad right-of-way that is no
longer used and converted into a pedestrian and cyclist thoroughfare. The unused New
York Susquehanna Western Railway Corporation rail line, which traverses the eastern
section of the Township from the northern boarder between Pequannock and Riverdale
heading southward parallel to Newark Pompton Turnpike and crossing the Pompton
River into Wayne near Pia Costa Lake at the southern boarder between Pequannock
and Lincoln Park. Currently the land is owned by the New York Susquehanna Western
Railway Corporation. The Township should look at acquire the land because this would
be ideal for the much needed greenway. The conversion of this property in to a
greenway would also assist the Morris County in realizing their goal of establishing a
multi-use trail system in this section of the county.
Another way to define a greenway is a street connected in a network throughout the
city, which is enhanced to provide a pleasant environment for pedestrians and cycling.
A greenway of this type would coincide with the proposed trail system in the Township
master plan, illustrated on appendix MPA #1. Six streets should be converted in to this
type of greenway, Newark Pompton Turnpike, West Franklin Avenue, Ackerson
Avenue, Mountain Avenue, Sunset road, Ackerson Avenue, and West Parkway. Turning
these streets into greenways would enable the parks, cultural and environmental
resources, and schools assessable for pedestrians and cycling directly from one of
these roads or with a short walk. West Parkway should have a bicycle lane in
conjunction with the County’s plan to link to an existing bicycle trail in Riverdale,
although this plan has been rejected by the residence on this road in the past.
Chapter 5 - Inventory and Analysis of Existing Resources
PENNONI ASSOCIATES INC.
Consulting Engineers
78
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Foothills Park
Rockledge Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
N.J. Landscape Project
Legend
Pequannock Township
Park Boundaries
Roads
Lakes
Streams
Forest
Rank 2
Rank 3
Rank 4
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 10
Forest
79
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Rockledge Park
Foothills Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
N.J. Landscape Project
Legend
Pequannock Township
Park Boundaries
Lakes
Streams
Roads
Rank 1
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 11
Grassland
81
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Rockledge Park
Foothills Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
N.J. Landscape Project
Legend
Pequannock Township
Park Boundaries
Lakes
Streams
Roads
Emergent
Rank 1
Rank 2
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 12
Emergent Wetlands
83
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Foothills Park
Rockledge Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
N.J. Landscape Project
Legend
Pequannock Township
Park Boundaries
Lakes
Streams
Roads
Forested Wetlands
Rank 1
Rank 2
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 13
Forested Wetlands
87
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Rockledge Park
Foothills Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
N.J. Landscape Project
Legend
Pequannock Township
Park Boundaries
Lakes
Streams
Roads
Wood Turtle
Rank 3
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 14
Wood Turtle Habitat
85
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
( ( ( ( ( ( ( (( ( (
(
( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (
( ( ( ( ( ( ( ( ( ( ( ( ( ( (
! ! ! ! ! ! ! !
!
Pyroxene
Gneiss
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Foothills Park
Rockledge Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
Boonton FormationQuartz
pebble
Conglomerate
eiss
Amphibolite
Quartz
Oligoclase
Gneiss
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
Geology Map
Legend
Pequannock Township
Park Boundaries
Lakes
Streams
Roads
Province Boundary
Geology
Amphibolite
Boonton Formation
Pyroxene Gneiss
Quartz-Oligoclase Gneiss
Quartz-pebble Conglomerate
! !
folds( (
faults0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 15
Highlands Province
Piedmont Province
89
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
USRHVB
UR
UR
CarAt
PrsdAt
UR
RNRE
USPREB
RNRE
PHG
OtsD
OtsC
PHG
UR
RNRE
PafAt
PbphAt
OtsC
PrsdAt
PafAt
BohC
RobCb
CarAt
HhmCa
RobCb
HhmCa
RomD PohA
FNAT
WATER
HhmCa
PohA
WATER
PrkAt
PafAt
RksA
BohC
RksB
RkgBc
RksA
PbphAt
WATER
RomC
RksB
PawE
Dc
RomC
PohB
PrkAt
RobCb
RkgBc
USROCC
RobCb
PohA
PrkAt
RksB
OtsC
RomC
PrkAt
bCb
PohB
OtsC
PbphAt
PohB
PbphAt
BohC
PohB
PohB
PrkAt
RksC
CarAt
OtsC
WATER
PrkAt
RksC
AdrAt
PrkAt
PohB
AdrAt
PrsdAt
PbphAt
PohA
BohB
OtsC
HhmDb
PHG
WkkAt
PohA
PohA
HanC
HhmCa
HhmDb
OtsD
RomE
WATER
PrkAt
PohB
USRHVB
RksB
OtsC
RomD
OtsD
BohB
PafAt
RobDc
PrsdAt
PrkAt
BohB
BohB
WATER
WATER
RomD OtsC PrkAt
PohB
PafAt
RksB
AdrAt
PrkAt
WATER
PohB
RobDc
HanB
RksB
PrsdAt
RobDc
WATER
PrkAt
WATER
WATER
WATER
WATER
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
Soils
Legend
Pequannock Township
Lakes
Streams
Roads
Soils
AdrAt
BohB
BohC
CarAt
FNAT
HanB
HanC
HhmCa
HhmDb
HokCg
MknA
NerB
NerC
OtsC
OtsD
PHG
PafAt
PawE
PbphAt
PohA
PohB
PrkAt
PrsdAt
RNRE
RkgBb
RkgBc
RksA
RksB
RksC
RobCb
RobDc
RomC
RomD
RomE
UR
USPREB
USRHVB
USROCC
WATER
WkkAt
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 16
91
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
POMPTON RIVER (WANAQUE)
RAMAPO RIVER
RAMAPO RIVER (WANAQUE)
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Rockledge Park
Foothills Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
EAST DITCH
WEST DITCH
POMPTON RIVER (WANAQUE)
POMPTON RIVER
WEST DITCH
EAST DITCH
EAST DITCH
EAST DITCH
EAST DITCH
EAST DITCH
POMPTON RIVER
POMPTON RIVER (WANAQUE)
POMPTON RIVER
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
Hydrology Map
Legend
Pequannock Township
Park Boundaries
Roads
Lakes
Streams
Subwatershed
Lincoln Park tribs (Pompton River)
Pequannock R (below Macopin gage)
Pompton River
Ramapo R (below Crystal Lake bridge)
Watershed
Pequannock River
Pompton River
Ramapo River
Wetlands
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 17
93
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Foothills Park
Rockledge Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
Groundwater Recharge
Legend
Pequannock Township
Park Boundaries
Lakes
Streams
Roads
Groundwater Recharge Rate
0.00 - 4.99
5.00 - 9.99
10.00 - 14.99
15.00 - 19.99
20.00 and >
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 19
97
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
&
< &<&
< &<Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Foothills Park
Rockledge Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
Not a SSA
Highlands
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
Aquifers Map
Legend
Pequannock Township
Park Boundaries
Roads
Lakes
Streams
&
< Public Community Water Supply WellsSurfical Aquifer
Sole Source Bedrock Aquifer
Highlands
Not a SSA
Ramapo
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 20
99
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Mountainside Park Aquatic Park
Woodland Lake
Lyman Park
Greenview Park
Foothills Park
Rockledge Park
Hidden Cove Park
Meyers Brook
Washington Park
Hillview Park
Cherry Street Park
Pequannock Valley Park
Town Hall Fields
Riverside Park
Lyon Park
NJ 23
ROUTE 504
ROUTE 511 ALTERNATE
SUNSET RD
MORRIS COUNTY 660
MOUNTAIN AVE
BEAVER BROOK RD
WEST PARKWAY
MANDEVILLE AVE
ALEXANDER AVE
MORRIS COUNTY 680
MORRIS COUNTY 635
HOPPER AVE
Pequannock Township
Recreation Master Plan
Land Cover (2002)
Legend
Pequannock Township
Park Boundaries
Lakes
Streams
Roads
Land Cover
AGRICULTURE
BARREN LAND
FOREST
URBAN
WATER
WETLANDS
0 0.25 0.5 0.75 1
Miles
Ż Information Sources:New Jersey Department of Environmental Protection
Bureau of Geographic Information Systems
http://www.nj.gov/dep.gis/index.html
Map 21
101
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
Chapter 6 – Benchmark to Similar
Recreation Systems
This master plan took a look at the recreation facilities that the adjacent
municipalities provide and municipalities in Morris County that were similar to
Pequannock Township (see Table 8). The similar communities were selected based
upon similar population, median family income and municipal area. Pequannock
Township provides recreation facilities similar to both benchmark groups. The
Township also has the opportunity to provide recreation opportunities that the other
municipalities don’t due to Pequannock Township’s location along rivers and at the
base of the mountains.
Table 8 ~ Benchmark communities recreation amenities.
The conclusion is that while Pequannock Township has a need for athletic fields, the
recreational facilities the Township provides is at a level similar to the benchmark
communities.
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
103
Chapter 6 – Benchmark to Similar Recreation Systems
PENNONI ASSOCIATES INC.
Consulting Engineers
104
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
105
Chapter 7 – Acquisition, Capital
Improvement and Maintenance
Recommendations
Pequannock Township has preserved a large quantity of the Township’s lands for
recreation use. The lands that are not currently developed are limited in the type of
development that can occur due to their location within the floodway or 100 year
floodplain or due to wetlands or steep slopes. These lands are regulated through
NJDEP and the NJ Highlands regulations. Opportunities, however, remain to address
the gap in parks and facilities. The greatest opportunities lie in redeveloping and adding
lands to existing parklands.
Existing Park Lands and Adjacent Land Acquisitions
Aquatic Park
A master plan was completed for Aquatic Park in 2004 where development
recommendations were made. This Master Plan makes recommendations to build upon
the previous recommendations. A new parking area was recommended in the Master
Plan at the Rt. 23 jug handle across from the Newark-Pompton Turnpike. This location
is feasible should the New York & Susquehanna Western Rail Road line be discontinued
and the right of way available for use as a regional trail network. Currently extensive
measures would have to be taken to safely convey users across the right-of-way either
at grade or under the tracks.
There currently is ATV use in several areas within the park. This use is not permitted
and is degrading the sites environmental conditions. More stringent enforcement is
needed. To do so, however, required better access. The site currently has access from
Carlson Place, which is limited due to no parking provided. In addition, with encroaching
uses from the south, potential park users may not be aware of what is park land and
what is private lands.
Opportunities exist for trail development, canoe portage points and camping areas.
Active recreation opportunities are not recommended for the existing parklands due to
poor access and the sensitive nature of the lands (wetlands, floodway and floodplain)
and the regulations imposed on these lands.
An opportunity exists, however, to expand the park to the south with the acquisition of
Block 306 Lot 4. The majority of this site is not impacted by wetlands and is fairly level
and would be suited for development as an athletic field. The site appears to support a
full size soccer/lacrosse field with parking for 120 cars. This parking could also serve as
trail head parking for the Park with entrance kiosk and map box (see map titled Aquatic
Park Concept Plan). The sites wetlands should be mapped to confirm their location and
ability to develop the parcel. Development of the site would require NJDEP permits.
This site provides one of the few opportunities to add athletic fields in Pequannock
Chapter 7 - Acquisition, Capital Improvement and
Maintenance Recommendations
PENNONI ASSOCIATES INC.
Consulting Engineers
106
Township. If acquisition is not feasible then exploration of an agreement with the current
owner may be able to be reached to allow the Township to use the land for a
soccer/lacrosse field.
Aquatic Park Program Elements
?
1.5 miles of trail development?
Land acquisition?
Soccer/lacrosse field development?
Parking lot development (two locations)?
Canoe portageCherry Street Park
According to NJDEP GIS mapping the majority of the site has wetlands and thus is
regulated by NJDEP. There is an apparent pocket with no wetlands by New Street. The
site is within the 100 year floodplain. The eastern border of the site abuts the New York
Susquehanna & Western Railway Corporation rail line. Washington Park lies across
Jefferson Street to the north. The Township owns four smaller parcels to the south of
the Park. These smaller parcels are also affected by wetlands.
This site can be developed with trails that can be a loop walking trail and connected to
New Street, Jefferson Street and the adjacent residences. NJDEP permits will be
required for development. Future connection to the railroad ROW can also occur should
that line be developed as a greenway trail. The smaller lots to the south (Block 3608
Lots 1, 4, 5 &6) should be added to the Township’s ROSI.
The Open Space and Recreation Plan recommended acquisition of two other lots ( Lot 2
& 3). These lots are adjacent to Cherry Street Park. They currently have a swimming
pool located approximately on the joint property line of the two lots. These lots appear
not to have wetlands associated with them. Should the land become available the
Township should pursue acquisition, as it would fill in between the main portion of the
Park and the smaller lots. Acquisition of these lots is not recommended at this time.
Cherry Street Park Program Elements
?
1.5 miles of trail developmentFoothills Park
The park is currently underutilized. There is a playground, parking and a cleared area
that is used for sledding in the winter. There is a small pond with a steep drop from the
south to the pond and according to NJDEP GIS mapping a small amount of wetlands to
the east of the pond. There are steep slopes along the northern border of the park. The
police have a training facility in the western section of the site cuts off access to the
northern and western portions of the site, thus leaving half of the park unused.
There is potential for development of this site to fulfill its role as a neighborhood or
community park and satisfy a portion of that need. To do this the northern and eastern
portions of the site need to be easily accessible to the residents. Long range the police
training facility should be removed from the park. Upon the discontinuing of the police
training facility the parking area may be relocated and a U-10 soccer field placed in that
area overlapping part of the existing parking.
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
107
A paved loop walking/exercise path should be developed passing by the pond and
encircling the eastern area of the park. This will provide opportunities for exercise and
nature study of the pond and wetland ecosystem with the inclusion of an overlook. A
community center can be developed in the eastern portion of the site with some parking.
See conceptual programming and footprint options. The community center building can
utilize the topography of the site to enter on the second level with parking built into the
hillside similar to other adjacent development. The community center would provide
opportunities for community events and a facility that would support the indoor recreation
and leisure programming that is currently offered.
A second possible location for the community center would be to the south of the parking
and playground area of the park. The top of the hill is relatively flat and access from
West Parkway can occur at the southern property line where the site and roadway grade
are compatible. Care should be taken to preserve as much of the sledding hill as
possible.
The upper area in the southwest section of the park can be developed as a U-10 soccer
practice area with the parking area expanded.
The pedestrian connection to the park needs to be improved though either a greenway
network including a sidewalk that can safely direct people to the park from the
residences to the south.
Foothills Park Program Elements
?
0.2 miles of trail development?
Paved walking trail?
Overlook?
Soccer practice field (U-10)?
Parking lot expansion?
Community Center?
Remove police training facilityGreenview Park
Greenview Park serves Pequannock and the neighborhood as a community park. It has
a wide variety of recreation and leisure opportunities. There is a deficit, however, of
parking to meet the provided facilities.
The parking demand was evaluated and it was found that there currently is a deficit of
seventy (70) parking spaces. This Master Plan presents, therefore, a recommended
parking and facility reconfiguration. The western parking lot would be restriped and
slightly expanded to improve efficiency. A new parking lot would be provided from the
entry off of Colfax Drive. The existing parking by the pond would be slightly expanded
and restriped. The parking lot by the tennis courts and the softball fields will be
expanded to the south slightly which will allow for a more efficient layout and increase
the number of parking spaces. In addition, the existing culvert from the Roberts Place
entrance should be lengthened to allow for two way traffic.
Chapter 7 - Acquisition, Capital Improvement and
Maintenance Recommendations
PENNONI ASSOCIATES INC.
Consulting Engineers
108
The connecting roadway between the parking near the pond and the parking near the
tennis courts is removed. This opens up the center of the park for more activities such
as a picnic shelter, spray pad and a playground. These new central uses support the
existing uses and allow opportunities to spend the entire day at the park.
The playground area would be developed when the existing playground structure
needed to be replaced. Short term the poor drainage at the existing playground needs
to be addressed.
Expansion of the existing lacrosse field to the east of the tennis courts is not feasible due
to the location of wetlands in the adjacent woods and the area being identified as
possible habitat for the wood turtle.
Greenview Park Program Elements
?
Parking lot reconfiguration and addition?
Roadway paving and curbing?
Existing playground drainage?
Picnic shelter and tables?
Spray pad?
Playground?
Pedestrian walkways?
LandscapingHidden Cove
The majority of area within Hidden Cove is open waters. Hidden Cove is used for
fishing. As it is contiguous with a swimming facility to the south the open water cannot
be used for boating. There is poor access to the site. No parking is provided on site
and the owner of the adjacent parcel will not allow shared parking. Users must park
across busy Lincoln Park Road and walk across.
A small parking lot of approximately six (6) parking spaces should be developed. Trails
should be formalized to the water’s edge. Trails to the west of the pond would most
likely be within wetlands and would require a permit. Fish habitat should be improved
with additional plantings that would eventually overhand the pond edge and
sunken logs and aquatic vegetation as places for fish to hide.
Hidden Cove Program Elements
?
Six car parking lot?
0.2 mile trail development?
Fish habitat enhancementHillview Fields
This facility is the best location to develop into a higher-use athletic facility. Community
uses are adjacent to seventy five percent (75%) of the site (two schools and the library)
and single family residential is adjacent on the remaining portion.
The site is heavily used for softball, baseball, soccer and lacrosse. Due to the demands
for athletic fields the fields do not have any time to rest the grass and as such the grass
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
109
is in poor condition. It is unlikely that unless the fields are allowed to rest and receive
irrigation that they would be of the quality that the Township wants to provide it’s
residents. Recommendations for Hillview fields include the installation of synthetic turf
and sports lighting.
Hillview Fields Program Elements
?
Synthetic turf?
Sports lightingLyman Park
According to NJDEP GIS data wetlands can be found throughout most of Lyman Park.
The portion of the park that appears to not have wetlands is in the central area, a portion
of which is cleared of trees. This cleared area may be used for soccer practice. The
wetlands can also be mapped to see if the field area may be enlarged.
The site is located within the 100 year floodplain and has poor drainage. To maximize
the field use subsurface drainage should be installed. Parking is currently available at
the end of the entrance road off Roosevelt Street.
Two adjacent lots (Block 4112 Lots 1&16) have been identified in the Open Space and
Recreation Plan for possible acquisition. Both of these parcels would be developable, at
least in part, for single family homes. It is unlikely, however, that they may be developed
for recreational use other than for trails due to wetlands and open waters on both sites.
These two parcels should be acquired to preserve these sensitive lands and increase
Lyman Park’s area.
Lyman Park Program Elements
?
Wetlands mapping?
Open field expansion for athletic practice field?
Expand trail network to 0.5 miles of trails.Lyon Park
This is a small mini-park with a playground and benches. The playground equipment
should be evaluated to conform to CPSC standards and upgraded if non-conforming.
This park would also benefit from the addition of picnic tables.
Lyon Park Program Elements
?
Playground equipment?
Picnic tablesMeyers Brook
Meyers Brook is an open water stream with a small buffer that runs along the backyards
of single family homes. This park should remain in it’s natural condition with periodic
maintenance for the removal of debris and hazardous trees.
Meyers Brook Program Elements
?
Open waters stream and bufferChapter 7 - Acquisition, Capital Improvement and
Maintenance Recommendations
PENNONI ASSOCIATES INC.
Consulting Engineers
110
Mountainside Park
Mountainside Park has great views of Pequannock and the surrounding valley. The
purchase of these properties preserved the ridgeline of the Waghaw Mountain and the
aesthetics and water quality for those in the valley below. The recently passed
Highlands Regulations has placed Mountainside Park in the Highlands Preservation
Area. This designation greatly limits the possible development of trails and supporting
facilities such as parking. Trails must be developed utilizing the native soils. It is
unlikely that the parking area will be able to be expanded as no new impermeable
surfaces may be added and gravel is interpreted as impermeable.
This being said, the trail network north of the parking area provides a varied experience
and overlooks of the valley below. A camping area is also located in this area.
Opportunities exist to add interpretive signage along the trails and at overlooks
describing the natural features and historic significance of the area.
There are no apparent trails south of the parking area. This Master Plan recommends
evaluation of this area of Mountainside Park for trail development. Criteria for
development should include unique geological features, land forms or vegetation.
Should no unique features be found the area is recommended to remain in it’s natural
state.
A larger, two sided, folded map should be developed consistent with trail system and
should include topography to aid in the trail user. The map should identify points of
interest. Descriptions of the points of interest should be included. It should be
developed to be reproduced in color and in black and white. The map could include a
brief description of the Waghaw Mountains and its history, the flora and fauna and the
various recreational opportunities within the park.
Mountainside Park Program Elements
?
4 miles of trails?
Parking area?
Camping area?
Interpretive signage?
Revised trail mapPequannock Valley Park
Pequannock Valley Park is the only swimming facility in Pequannock Township. The
facility is heavily used providing a lake with open swim and swim meets, beach,
playground, basketball court and bathhouse. These facilities are in good condition. The
entire facility, however, is in need of updating to provide new amenities to continue to
draw members.
A dam at the eastern end of Woodland Lake creates the pond used for swimming at
Pequannock Valley Park. The dam currently is in need of repair in the next couple years
that will cost $400,000 (in 2005 dollars). The repairs would be good for approximately 5
years, then additional repairs are likely.
A master plan specifically for Pequannock Valley Park should be completed the first year
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
111
that would evaluate other aquatic complex amenities that could be provided. The master
plan should include a guest services plan and market feasibility analysis. It is critical, as
part of this work, to assess the current operating profile as well as the future operating
potential given an enhanced product and expanded revenue streams.
Pequannock Valley Park Program Elements
?
Master Plan?
Swimming lake?
Swimming lanes?
Beach?
Playground equipment?
Basketball courtRiverside Park
This park provides an opportunity for neighborhood children to play on playground
equipment and enjoy nature. Similar to Lyon Park, the playground equipment should be
evaluated to conform to CPSC standards and upgraded if non-conforming. This park
would also benefit from the addition of picnic tables.
The Open Space and Recreation Plan recommend the addition of three parcels to this
park, Block 4403/Lot 1, 2 & 3. Block4403/Lot 1 plan would make a good addition to
Riverside Park. Two of the three lots are privately owned (Lots 1 & 2). According to
NJDEP GIS data a portion of Lot 2 and all of Lot 3 are within the Pompton River
floodway and all of Lot 1 and the remaining portion of Lot 2 are within the 100-year flood
plain. The parts of the properties within the floodway would not be able to be developed
do to environmental restrictions. The developable area on these lots would support a
small playground and a U-10 soccer field based upon spatial data only. Topographic
information was not available for review. Further feasibility of this site for development
as a practice location should be completed to determine final acquisition
recommendation.
Riverside Park Program Elements
?
Playground equipment?
Picnic tables?
Feasibility studyRockledge Park
The Township Open Space and Recreation Master Plan recommended two Township
owned parcels be added to the existing park holdings. The Township implemented this
recommendation.
According to NJDEP GIS data wetlands are located on the majority of this site. Even
with the regulation restrictions that go along with the wetlands this park would be good to
develop as a neighborhood park as there are two potential areas, east of Farm Road
and east of Copley Court, that appear to be non-wetlands. Both of these areas are
currently cleared and if they are not wetlands, may be used for athletic fields, playground
and/or parking. It is recommended that wetlands mapping be completed for these two
areas.
Chapter 7 - Acquisition, Capital Improvement and
Maintenance Recommendations
PENNONI ASSOCIATES INC.
Consulting Engineers
112
The area east of Copley Court is large enough to support a U-10 practice soccer field,
small playground equipment and a small parking lot in the current clearing. The size of
development is likely smaller with a required fifty foot (50’) buffer minimum around all
wetlands. The area east of Farm Road may be used for picnicking or a small practice
field. In addition, hiking trails/boardwalks should be developed as a loop trail with
connections to the four directions.
The entire park is also within the 100 year floodplain and has been identified as possible
wood turtle habitat. There is a restriction on having to balance soil moving done on site.
In addition, a study may have to be completed to verify whether wood turtles, a New
Jersey threatened species, are found on the site. If they are then the entire park may
not be developable, even for trails.
There is currently a basketball hoop installed on the eastern side of Farm Road terminus
cul-de-sac. If this is a Township facility it should be moved out of the roadway and if it is
not a Township facility it should be removed from the right-of-way.
Rockledge Park Program Elements
?
Wetlands mapping?
Playground equipment?
Soccer practice field?
Small parking lot?
Picnic tables?
Basketball hoopTown Hall Fields
The existing baseball field is in good condition and already has an irrigation system. The
basketball courts on site are in fair condition and need resurfacing and new backstops.
Installing a playground area will help satisfy a demand for playground equipment in the
central park of the Township. Due to the close proximity of facilities within the park it is
not recommended to install synthetic turf or lights on this field.
Town Hall Fields Program Elements
?
Baseball field?
Playground equipment?
Picnic tablesWashington Park
Reconfiguring Washington Park provides the best opportunities to increase the number
of athletic fields in the Township. The Department of Public Works currently utilizes
approximately one third of the site as a dump site for spoils from construction work in the
Township, either by contractors or Township employees. This has a negative effect on
the natural and human environment in the park. The debris piles are beginning to
encroach within the wetland buffer and this area is highly visible when entering from
Jefferson Street leaving a negative impression with park users.
Washington Park should no longer be used as a dump site. Construction spoils should
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
113
be disposed of at an appropriate facility. Prior to cleaning up the site a Phase I
environmental analysis should be completed if it hasn’t been done previously. The site
should be cleaned to residential standards to allow for use as a public park.
Evaluating the site only spatially and from site visits (topographic information was not
available) it was found that by reconfiguring the entrance road from Jefferson Street a
baseball field and a soccer field as well as supporting parking, playground area and
walkways could be developed on site. The playground would meet the need for
playground equipment as part of a mini-park, in this part of town as well as a supporting
use for the siblings or children of athletes utilizing the fields. The new fields should be
developed with synthetic turf and sports lights.
This development would require NJDEP permits and would be predicated on completing
a buffer averaging plan where the proposed shift of the buffer is equal in ecological
value. If NJDEP will not accept the proposed transition area adjustment then the
baseball field can be reduced in size to a softball field.
Washington Park Program Elements
?
Soccer field with synthetic turf?
Baseball field with synthetic turf?
Sports lights?
New and reconfigured parking lots?
Playground equipment?
Walkways?
Picnic tablesWoodland Lake
The majority of the area at Woodland Lake is the lake itself. The entrance off of
Alexander Avenue goes to a small gravel parking area with a couple benches and a boat
launch area. There are some trails through the vegetation. The lake edge at this point
has been reinforced with slabs of concrete creating a wall on either side of the boat
launch area.
Immediate improvements to this park should include reconstruction of the boat launch
and the addition of benches standard with the Township’s design standards and further
trail development. Long term improvements would include reconstruction of the lake
edge adjacent to the boat launch and lake edge habitat enhancement.
The Township’s Open Space and Recreation Plan recommended acquisition of Block
2701 Lots 2, 3 & 4. These parcels are recommended for acquisition as stated in the
OSRP as a buffer between developments between Rt. 23 and for trail development.
There currently is no access to the eastern side of the lake via land as the property lines
extend into the lake area.
Woodland Lake Program Elements
?
Boat Launch reconstruction?
Lake edge wall reconstruction?
Lake edge habitat enhancementChapter 7 - Acquisition, Capital Improvement and
Maintenance Recommendations
PENNONI ASSOCIATES INC.
Consulting Engineers
114
?
0.2 miles of trail developmentOther Land Acquisitions and Township Owned Lands
Pequannock Township’s Open Space and Recreation Master Plan identified other
parcels currently owned by the Township as undeveloped lands within Town with the
potential for use as recreation opportunities. The following section described these
parcels and their possible use for recreation opportunities.
Block 3708 Lot 1,8
These lands are located in the southern section of Town on Rt. 23 and near Pequannock
Avenue. They are within the floodway of the Pompton River and have wetlands located
on the lands. Access to the site is only from the south from Wayne. They are not
developable in accordance with current regulations and as such are not available for
recreation use. Acquisition is also not recommended at this time as state regulations
prohibit development of these parcels at this time thus, the ecological value of the land
will remain for the time being.
Block 2402 Lot 11
This parcel lies just west of West Parkway and in between the hospital and agriculture
lands. According to NJDEP GIS data the site is entirely wetlands and is in the middle of
a larger wetland area. State wetlands regulations would prohibit the development of this
parcel as active recreation. The Township already has varied opportunities for trail
development on other wetland parcels. Acquisition of this parcel is not recommended at
this time.
Block 4401 Lot 14
This parcel is the Pia Costa Tract. The owner intends to develop the site as a wetlands
mitigation bank. This would be a benefit for the Township to continue the sites ability to
help control flood waters and act as habitat for flora and fauna. The Township should
actively participate in the process to maintain the possibility for trail development
connecting Hidden Cove to the possible future developed trail on the railroad right-ofway.
No acquisition of this parcel is recommended.
Two other parcels, Block 302 Lot 2 and Block 202 Lot 23 were identified in the Open
Space and Recreation Plan as potential recreation sites. The first site has a commercial
building and parking on site. The second site has three commercial buildings and
parking on site. Neither of them is suitable for recreational use.
Design Guidelines
It is recommended that a coherent set of Design Guidelines be prepared as a first year
task. Over the upcoming years, these Guidelines can direct the work of various
landscape architects, engineers, foresters, architects, Township maintenance personnel
and volunteers in the appropriate design of the landscape and the facilities inserted into
it. Thus, the style and materials of construction will be readily understood and can be
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
115
applied to the Township’s parks over many years as the Master Plan recommendations
are implemented.
The Design Guidelines should include:
Structures
?
Picnic shelters?
Façade treatment?
Rooflines and roofing materials?
Fenestration?
Bridges?
Culverts and other drainage structures?
OverlooksWayfinding System
?
Size hierarchy for various purposes?
Color and material of signs?
Letter font and hierarchyLandscape Elements
?
Stone type and jointing for various uses (cobble, walls, drainage courses)?
Road surfaces?
Path materials, cross section, and edges?
Stairs for various conditions?
Handrails, guardrails, and fencing?
Bollards?
Bicycle racks?
Trash receptacles?
Picnic tables?
Fireplace and grill structures?
Benches?
Drinking fountains?
Light fixtures?
Various swale edges and water coursesVegetation Management
?
Native plantings for various purposes?
Establishment of new meadow edges and meadow installation?
Management for reestablishment and maintenance of vistasSignage
Signage should be consistent throughout the Township (i.e. Woodland Lake). The
current signage is hard to read with black letters outlined in white on a dark wood
background. It is recommended that the signage be updated with letters easier to read
at a minimum. An opportunity exists to redesign the signage with a clear and consistent
hierarchy of sizes for various functions. A consistent language of form, color and
Chapter 7 - Acquisition, Capital Improvement and
Maintenance Recommendations
PENNONI ASSOCIATES INC.
Consulting Engineers
116
graphic design should also be developed for the park system. All entrances to the parks
should be clearly marked with such consistent signage. Informational signage could be
placed at historically significant locations describing the location such as overlooks in
Mountainside Park.
Actions
The following are actions to be completed based upon the previous recommendations.
The tasks are listed in priority order within each task category.
Immediate Actions (within one year)
1. Complete Greenview Park parking reconfiguration improvements.
2. Develop an action plan to pursue funding sources identified in the Open Space
and Recreation Plan to fund the recommended improvements.
3. Acquire funding to implement Hillview Fields improvements.
4. Remove DPW dump yard from Washington Park and remediate to residential
standards. Conduct a pre-application meeting with the NJ DEP to discuss the
proposed improvements.
5. Complete topographic and utility mapping for Washington Park improvements.
6. Develop and implement a comprehensive maintenance operations tasks and
schedule for each facility.
7. Begin negotiations for acquisition / agreement for use of Block 902 Lot 4 as a
soccer / lacrosse field with supporting parking.
8. Continue dialogue with the Board of Education on shared use for athletic fields
and existing field reconfiguration to expand field usage. Work with the sports
groups in town to leverage funding and manpower.
9. Further explore the programming and location for an indoor community
recreation facility.
10. Complete master plan for Pequannock Valley Park.
11. Develop a plan to coordinate all recreational opportunities and organizations
within the Township with possible shared scheduling of facilities.
12. Complete site development / park and recreation design guidelines.
13. Develop signage system and hierarchy.
14. Contact owners of farm assessed lands to encourage their participation in the
farmland preservation program.
Intermediate Actions (within three years)
1. Jointly implement Board of Education athletic field improvements with the BOE
and local recreation groups.
2. Develop a self-guided tour map along the adopted greenway identifying cultural,
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
117
social, recreational and environmental points of interest.
3. Complete wetlands mapping for Rockledge Park, Cherry Street Park, Hidden
Cove and Lyman Park.
4. Update Aquatic Park Master Plan
5. Develop “Friends of the Park” program.
6. Develop and adopt a Township Greenway Network.
7. Complete Hillview Fields Improvements.
8. Complete Washington Park improvements.
9. Complete Rockledge Park improvements
10. Implement signage improvements.
Intermediate Actions (within five years)
1. Complete soccer / lacrosse field improvements at Aquatic Park.
2. Riverside Park expansion feasibility study.
3. Complete Aquatic Park Master Plan recommendations.
4. Complete Hidden Cove improvements.
5. Complete Cherry Street Park improvements.
6. Implement Aquatic Park Master Plan.
7. Acquisition of parcels adjacent to Lyman Park (Block 4112 Lots 1&16).
8. Complete fundraising for Community Recreation Center.
Long Term Actions (within 10 years)
1. Implement Community Recreation Center.
2. Complete Woodland Lake improvements.
3. Complete remainder of Greenview Park improvements.
4. Update Park and Recreation Master Plan including the completion of a
statistically accurate user survey.
Ongoing Actions
1. Continued park maintenance.
2. Continue comprehensive maintenance operations tasks and schedule for each
facility.
3. Continued signage maintenance.
4. Continued streetscape improvements maintenance.
5. Add all new land acquisitions to the Township ROSI.
6. Actively participate in regional environmental issues (i.e. the Pia Costa Tract
Chapter 7 - Acquisition, Capital Improvement and
Maintenance Recommendations
PENNONI ASSOCIATES INC.
Consulting Engineers
118
wetland mitigation bank) and recreation issues (i.e. the Pequannock River Trail).
7. Monitor land acquisition opportunities for use as recreational facilities.
8. Monitor environmental regulations and possible weakening of regulations which
would increase land acquisition for environmental preservation up in priority.
9. Work with Morris County to implement regional trails within the Township
including along the railroad right-of-way.
10. Designate a Recreation Advisory Board member as liaison to each of the
environmental, historic, open space and street tree commissions.
11. Encourage stewardship of the parks and social ties through the “Friends of the
Park” program.
12. Seek continued input from the community regarding recreation programs and
facilities.
13. Implement the fund raising action plan.
The table titled
Facility Strategy and Implementation on the following page identifiesthe costs associated with the recommendations noted above. Itemized costs can be
found in Appendix A.
Pequannock Township Town-wide Park and Recreation Master Plan
Table 9 ~ Facility Strategy and Implementation Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
119
Chapter 7 - Acquisition, Capital Improvement and
Maintenance Recommendations
PENNONI ASSOCIATES INC.
Consulting Engineers
120
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Appendices
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Appendix A – Estimates of Probable Costs
Description Quantity Unit Unit Cost Total Cost
Land Acquisition
Block 902, Lot 4 1 each $1,068,300.00 $1,068,300
Demolition
Tree removals 10 each $2,000.00 $20,000
subbase removal 2000 c.y. $15.00 $30,000
New Work
Earth work 10000 c.y. $26.00 $260,000
Asphalt paving 5600 s.y. $75.00 $420,000
Asphalt walk 4280 s.f. $6.00 $25,680
Player's benches 6 each $800.00 $4,800
Drainage 1 l.s. $30,000.00 $30,000
Subsurface drainage 1 l.s. $50,000.00 $50,000
Benches 6 each $1,180.00 $7,080
Play structure 1 each $45,000.00 $45,000
Safety surface 1 l.s. $58,000.00 $58,000
Trail 25600 s.f. $6.00 $153,600
Lawn (seed) 2000 s.y. $15.00 $30,000
Lawn (sod, athletic fields) 11500 s.y. $25.00 $287,500
Landscaping 1 l.s. $15,000.00 $15,000
Irrigation 1 l.s. $50,000.00 $50,000
Flag Poles 3 each $800.00 $2,400
Site lighting 20 each $2,500.00 $50,000
Bleachers (3 row, 42 seat) 2 each $5,000.00 $10,000
Drinking fountain 1 each $3,500.00 $3,500
Subtotal
$1,552,560GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$310,512DESIGN CONTINGENCY (15%)
$232,884CONSTRUCTION CONTINGENCY (7%)
$108,679PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$232,884TOTAL PROJECT PROBABLE COST $2,487,519
SAY $2,500,000
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Aquatic Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's experience
and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The engineer does
not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. A wetlands transition area plan must be approved by NJDEP for this layout. if averaging is not approved U-10 soccer field would need
to be reduced to a U-8 size field. This estimate of probable costs does not include any work regarding the existing wetland mitigation, or
sports lighting.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Playground equipment and safety surface does not include swings.
4. Unit costs include material, equipment and labor costs.
5. Land aquisition costs based upon current assessed value.
Y:\26150000\Docs\Estimate of Probable Costs\Aquatic Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Description Quantity Unit Unit Cost Total Cost
New Work
Trail 25600 s.f. $6.00 $153,600
Benches 3 each $1,180.00 $3,540
Subtotal
$157,140GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$31,428DESIGN CONTINGENCY (15%)
$23,571CONSTRUCTION CONTINGENCY (7%)
$11,000PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$23,571TOTAL PROJECT PROBABLE COST $296,710
SAY $300,000
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Cherry Street Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. NJDEP permit(s) are required to develop trails within wetland areas.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Cherry Street Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Foothills Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
Demolition
Tree removals 10 each $2,000.00 $20,000
Asphalt & subbase removal 1000 c.y. $45.00 $45,000
New Work
Community Center Building 35000 s.f. $220.00 $7,700,000
Asphalt paving 2000 s.y. $75.00 $150,000
Asphalt walk 5000 s.f. $6.00 $30,000
Earth work 5500 c.y. $26.00 $143,000
Retaining wall 340 l.f. $750.00 $255,000
4' ht chain link fence 340 l.f. $240.00 $81,600
Trail 3600 s.f. $5.00 $18,000
Player's benches 4 each $800.00 $3,200
Drainage 1 l.s. $65,000.00 $65,000
Subsurface drainage 1 l.s. $40,000.00 $40,000
Benches 10 each $1,180.00 $11,800
Lawn (seed) 3000 s.y. $15.00 $45,000
Lawn (sod, athletic fields) 3500 s.y. $25.00 $87,500
Irrigation 1 l.s. $75,000.00 $75,000
Flag Poles 3 each $800.00 $2,400
Site lighting 15 each $2,500.00 $37,500
Bleachers (3 row, 42 seats) 2 each $5,000.00 $10,000
Drinking fountain 1 each $3,500.00 $3,500
Subtotal
$8,823,500GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$1,764,700DESIGN CONTINGENCY (15%)
$1,323,525CONSTRUCTION CONTINGENCY (7%)
$617,645PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$1,323,525TOTAL PROJECT PROBABLE COST $13,902,895
SAY $14,000,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. This estimate of probable costs includes costs for a community center building based upon concept floor plans. The final
programming should be determined as part of the park master plan process.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Foothills Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Description Quantitiy Unit
Unit Cost
(Material, Equipment,
and Labor)
Total CostDemolition
Tree removals (approximate) 30 each $2,000.00 $60,000
Asphalt and subbase removal 1200 s.y. $6.00 $10,000
Earthwork 2500 c.y. $5.00 $15,000
New Work
Asphalt roadway pavement (no curb) 2000 s.y. $40.00 $80,000
Asphalt topcourse 9500 s.y. $7.00 $66,500
Concrete Pavement 13500 s.f. $8.00 $110,000
Athletic turf (seed) 1.3 m.s.f. $300.00 $500
Topsoil (2") 800 c.y. $40.00 $32,000
Play spray (2,500 s.f. - 5 features) 1 l.s $100,000.00 $100,000
Picnic Shelter 1 l.s. $23,000.00 $23,000
Playground (Phase II) 1 l.s. $300,000.00 $300,000
Storm drainage allowance 1 l.s. $60,000.00 $60,000
$857,000
$171,400
$128,550
$59,990
$128,550
$1,345,490
SAY $1,400,000
* Excludes any work regarding existing utility pit, site lighting, restroom upgrades, and permit costs (if required).
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices, market
conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's experience and
qualifications and represents his best judgement as a design professional, familiar with the construction industry. The engineer does not
guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%
DESIGN CONTIGENCY (15%)
CONSTRUCTION CONTINGENCY (7%)
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Greenview Park
Programing Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
PROFESSIONAL FEES
TOTAL PROJECT COST
Subtotal
Y:\26150000\Docs\Estimate of Probable Costs\Greenview Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Hidden Cove
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
New Work
Trail 4000 s.f. $6.00 $24,000
Habitat enhancement 1 l.s. $100,000.00 $100,000
Asphalt pavement 300 s.y. $65.00 $19,500
Subtotal
$143,500GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$28,700DESIGN CONTINGENCY (15%)
$21,525CONSTRUCTION CONTINGENCY (7%)
$10,045PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$21,525TOTAL PROJECT PROBABLE COST $275,295
SAY $280,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. NJDEP permit(s) are required to develop trails within wetland areas.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Hidden Cove
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Hillview Fields
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
Demolition
Tree removals 30 each $2,000.00 $60,000
Asphalt and subbase removal 3484 c.y. $30.00 $104,520
Fence 365 l.f. $25.00 $9,125
New Work
Asphalt paving 8500 s.y. $75.00 $637,500
Asphalt walk 12500 s.f. $6.00 $75,000
Player's benches 6 each $800.00 $4,800
Infield clay (6" depth) 1900 c.y. $100.00 $190,000
Backstop 4 each $17,500.00 $70,000
10' high chain link fence 2000 l.f. $350.00 $700,000
Multi-purpose synthetic turf 1 l.s. $1,250,000.00 $1,250,000
Sports lighting 5 each $85,000.00 $425,000
Drainage 1 l.s. $55,000.00 $55,000
Benches 12 each $1,180.00 $14,160
Trash Receptacles 8 each $1,500.00 $12,000
Play structure 1 each $45,000.00 $45,000
Safety surface 1 l.s. $58,000.00 $58,000
Landscape 1 l.s. $20,000.00 $20,000
Shade Trees 30 each $280.00 $8,400
Flag Poles 3 each $800.00 $2,400
Site lighting 25 each $2,500.00 $62,500
Bleachers (3 row) 8 each $5,000.00 $40,000
Drinking fountain 3 each $3,500.00 $10,500
Subtotal
$3,853,905GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$770,781DESIGN CONTINGENCY (15%)
$578,086CONSTRUCTION CONTINGENCY (7%)
$269,773PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES (15%)
$578,086TOTAL PROJECT PROBABLE COST $6,100,631
SAY $6,100,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices, market
conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's experience and
qualifications and represents his best judgment as a design professional, familiar with the construction industry. The engineer does not
guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. Layout will have to be finalized based upon a buffer averaging plan applicationapproval by NJDEP.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Playground equipment and safety surface does not include swings.
4. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Hillview Fields
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Lyman Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
Demolition
Tree removals 10 each $2,000.00 $20,000
New Work
Earth work 11500 c.y. $26.00 $299,000
Asphalt walk 1600 s.f. $6.00 $9,600
Trails 9000 s.f. $5.00 $45,000
Player's benches 4 each $800.00 $3,200
Drainage 1 l.s. $30,000.00 $30,000
Subsurface drainage 1 l.s. $50,000.00 $50,000
Benches 6 each $1,180.00 $7,080
Lawn (sod, athletic fields) 11500 s.y. $25.00 $287,500
Bleachers (3 row, 42 seat) 2 each $5,000.00 $10,000
Drinking fountain 1 each $3,500.00 $3,500
Subtotal
$764,880GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$152,976DESIGN CONTINGENCY (15%)
$114,732CONSTRUCTION CONTINGENCY (7%)
$53,542PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$114,732TOTAL PROJECT PROBABLE COST $1,250,862
SAY $1,300,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. A wetlands delinieation will need to be completed as a part of the site development to verify limit of field development.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Lyman Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Lyon Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
Demolition
Play structure 1 each $10,000.00 $10,000
New Work
Earth work 300 c.y. $26.00 $7,800
Asphalt walk 500 s.f. $6.00 $3,000
Player's benches 4 each $800.00 $3,200
Benches 4 each $1,180.00 $4,720
Lawn (seed) 100 s.y. $25.00 $2,500
Play structure 1 each $45,000.00 $45,000
Safety surface 1 l.s. $58,000.00 $58,000
Flag Pole (25' ht) 1 each $800.00 $800
Drinking fountain 1 each $3,500.00 $3,500
Subtotal
$138,520GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$27,704DESIGN CONTINGENCY (15%)
$20,778CONSTRUCTION CONTINGENCY (7%)
$9,696PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$20,778TOTAL PROJECT PROBABLE COST $267,476
SAY $270,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. A wetlands transition area plan must be approved by NJDEP for this layout. if averaging is not approved U-10 soccer field would
need to be reduced to a U-8 size field. This estimate of probable costs does not include any work regarding the existing wetland
mitigation, or sports lighting.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Playground equipment and safety surface does not include swings
4. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Lyon Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Mountainside Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
New Work
Trails 64000 s.f. $8.00 $512,000
Signage 10 each $1,500.00 $15,000
Trail Map Development 1 l.s. $15,000.00 $15,000
Subtotal
$542,000GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$108,400DESIGN CONTINGENCY (15%)
$81,300CONSTRUCTION CONTINGENCY (7%)
$37,940PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$81,300TOTAL PROJECT PROBABLE COST $900,940
SAY $900,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. This estimate of probable costs does not include any work regarding the existing parking lot.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. All work within Mountainside Park must be approved by the Highlands Council.
Y:\26150000\Docs\Estimate of Probable Costs\Mountainside Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Riverside Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
Demolition
Play structure 1 each $10,000.00 $10,000
New Work
Earth work 300 c.y. $26.00 $7,800
Asphalt walk 3600 s.f. $6.00 $21,600
Player's benches 4 each $800.00 $3,200
Benches 4 each $1,180.00 $4,720
Lawn (seed) 200 s.y. $25.00 $5,000
Play structure 1 each $45,000.00 $45,000
Safety surface 1 l.s. $58,000.00 $58,000
Flag Pole (25' ht) 1 each $800.00 $800
Drinking fountain 1 each $3,500.00 $3,500
Subtotal
$159,620GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$31,924DESIGN CONTINGENCY (15%)
$23,943CONSTRUCTION CONTINGENCY (7%)
$11,173PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$23,943TOTAL PROJECT PROBABLE COST $300,603
SAY $300,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. NJDEP permit(s) may be required to replace the playground structure.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Playground equipment and safety surface does not include swings.
4. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Riverside Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Rockledge Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
Demolition
Tree removals 10 each $2,000.00 $20,000
New Work
Earth work 500 c.y. $26.00 $13,000
Asphalt paving 2400 s.y. $75.00 $180,000
Trail 20000 s.f. $8.00 $160,000
Player's benches 4 each $800.00 $3,200
Drainage 1 l.s. $15,000.00 $15,000
Subsurface drainage 1 l.s. $25,000.00 $25,000
Benches 5 each $1,180.00 $5,900
Play structure 1 each $45,000.00 $45,000
Safety surface 1 l.s. $58,000.00 $58,000
Lawn (sod, athletic fields) 11500 s.y. $25.00 $287,500
Landscaping 1 l.s. $25,000.00 $25,000
Irrigation 1 l.s. $50,000.00 $50,000
Site lighting 10 each $2,500.00 $25,000
Bleachers (3 row, 42 seat) 4 each $5,000.00 $20,000
Drinking fountain 1 each $3,500.00 $3,500
Subtotal
$936,100GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$187,220DESIGN CONTINGENCY (15%)
$140,415CONSTRUCTION CONTINGENCY (7%)
$65,527PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$140,415TOTAL PROJECT PROBABLE COST $1,519,677
SAY $1,600,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. A wetlands delineation approved by NJDEP is required to finalize development.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Playground equipment and safety surface does not include swings.
4. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Rockledge Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Town Hall Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
Demolition
Tree removals 2 each $2,000.00 $4,000
New Work
Earth work 10000 c.y. $26.00 $260,000
Asphalt walk 3500 s.f. $6.00 $21,000
Player's benches 6 each $800.00 $4,800
Infield clay (6" depth) 800 c.y. $100.00 $80,000
Backstop 1 each $17,500.00 $17,500
4' ht chain link fence 650 l.f. $240.00 $156,000
10' ht chain link fence 500 l.f. $380.00 $190,000
Drainage 1 l.s. $65,000.00 $65,000
Subsurface drainage 1 l.s. $50,000.00 $50,000
Benches 8 each $1,180.00 $9,440
Play structure 2 each $45,000.00 $90,000
Safety surface 1 l.s. $70,000.00 $70,000
Lawn (seed) 2600 s.y. $15.00 $39,000
Lawn (sod, athletic fields) 3100 s.y. $25.00 $77,500
Shade Trees 15 each $280.00 $4,200
Landscaping 1 l.s. $25,000.00 $25,000
Irrigation 1 l.s. $100,000.00 $100,000
Flag Pole (25' ht) 1 each $800.00 $800
Sports lighting 1 l.s. $80,000.00 $80,000
Bleachers (3 row, 42 seat) 2 each $5,000.00 $10,000
Drinking fountain 2 each $3,500.00 $7,000
Subtotal
$1,361,240GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$272,248DESIGN CONTINGENCY (15%)
$204,186CONSTRUCTION CONTINGENCY (7%)
$95,287PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$204,186TOTAL PROJECT PROBABLE COST $2,187,147
$2,200,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's
experience and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The
engineer does not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
2. Playground equipment and safety surface does not include swings.
3. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Town Hall Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Washington Park
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007
Pennoni Job No. 2615.0000
Description Quantity Unit Unit Cost Total Cost
Demolition
Tree removals 30 each $2,000.00 $60,000
Asphalt and subbase removal 3500 c.y. $30.00 $105,000
Fence (DPW Yard) 370 l.f. $25.00 $9,250
New Work
Earth work 10000 c.y. $26.00 $260,000
Asphalt paving 7700 s.y. $75.00 $577,500
Asphalt walk 18500 s.f. $6.00 $111,000
Player's benches 6 each $800.00 $4,800
Infield clay (6" depth) 470 c.y. $100.00 $47,000
Backstop 1 each $17,500.00 $17,500
4' ht chain link fence 1200 l.f. $240.00 $288,000
Drainage 1 l.s. $65,000.00 $65,000
Subsurface drainage 1 l.s. $50,000.00 $50,000
Benches 12 each $1,180.00 $14,160
Play structure 1 each $45,000.00 $45,000
Safety surface 1 l.s. $58,000.00 $58,000
Lawn (seed) 4500 s.y. $15.00 $67,500
Lawn (sod, athletic fields) 11500 s.y. $25.00 $287,500
Shade Trees 40 each $280.00 $11,200
Landscaping 1 l.s. $25,000.00 $25,000
Irrigation 1 l.s. $100,000.00 $100,000
Flag Pole (25' ht) 1 each $800.00 $800
Site lighting 35 each $2,500.00 $87,500
Bleachers (3 row, 42 seat) 4 each $5,000.00 $20,000
Drinking fountain 2 each $3,500.00 $7,000
Subtotal
$2,318,710GENERAL CONDITIONS, OVERHEAD, AND PROFIT (20%)
$463,742DESIGN CONTINGENCY (15%)
$347,807CONSTRUCTION CONTINGENCY (7%)
$162,310PERMIT COSTS (ALLOWANCE)
$50,000PROFESSIONAL DESIGN FEES
$347,807TOTAL PROJECT PROBABLE COST $3,690,375
SAY $3,700,000
Since the engineer has no control over cost of labor, materials, equipment, or over the contractor's methods of determining prices,
market conditions, or over competitive bidding; this estimate of costs for the Project is made upon the basis of the engineer's experience
and qualifications and represents his best judgment as a design professional, familiar with the construction industry. The engineer does
not guarantee that proposals, bids, or the project construction cost will not vary from this cost estimate.
Notes:
1. A wetlands buffer averaging plan must be approved by NJDEP for this layout.
2. Permit Costs include storm drainage design, preparation of NJDEP and SESC permit applications and permit fees.
3. Playground equipment and safety surface does not include swings.
4. Unit costs include material, equipment and labor costs.
Y:\26150000\Docs\Estimate of Probable Costs\Washington Park
Pequannock Township Town-wide Park and Recreation Master Plan
PENNONI ASSOCIATES INC.
Consulting Engineers, Landscape Architects and Planners
Pequannock Township Town-Wide Park and Recreation Master Plan
Pequannock Township, Morris County, New Jersey
Woodland Lake
Programming Estimate of Probable Costs
Professional Planning and Engineering Division of Pennoni Associates, Inc.
March 2007